14
Views
0
CrossRef citations to date
0
Altmetric
Research Article

Quality control for production and shipment process of product

&
Pages 331-345 | Received 01 May 2021, Published online: 03 May 2022
 

Abstract

In this article, the authors propose the integrated application of type I continuous sampling plan (CSP-1 plan) and Dodge-Romig rectifying inspection plan with quality loss and product cost. The normal quality characteristic, nominal-the-best, and asymmetric quadratic quality loss function of product are considered.

The CSP-1 plan is firstly applied in the process control. Then Dodge-Romig rectifying inspection plan is applied in the product improvement. The optimal combination of parameters of CSP-1 plan and asymmetric specification limit coefficients are obtained under the specified average outgoing quality limit (AOQL) protection. The optimal combination of parameters of Dodge-Romig rectifying inspection plan and quality investment are determined under the specified consumer’s risk. Finally, the sensitivity analysis of numerical example will be provided for illustration.

Subject Classification: (2010):

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.