238
Views
28
CrossRef citations to date
0
Altmetric
Original Articles

Economic lot sizing for an imperfect production system subject to random breakdowns

&
Pages 73-92 | Received 21 Jul 2004, Published online: 25 Jan 2007
 

Abstract

This article considers an economic manufacturing quantity model for an imperfect production process that is subject to random machine breakdowns. The product is manufactured intermittently in batches to meet a constant demand. During a production run, the system is assumed to deteriorate over time. As a result, a fixed proportion of items produced are defective. The system is also subject to random breakdowns. A no-resumption inventory control policy is adopted. Under this policy, the production run is aborted when a breakdown occurs. Production will be resumed only when all on-hand inventories are depleted. Corrective maintenance is carried out immediately after a breakdown. The time-to-shift and the time-to-breakdown are two random variables following different exponential distributions. The objective is to find an optimal production lot size that minimizes the expected (long-run) total cost per unit time. Several models are investigated and a numerical approach is developed to obtain an optimal production lot size.

Log in via your institution

Log in to Taylor & Francis Online

PDF download + Online access

  • 48 hours access to article PDF & online version
  • Article PDF can be downloaded
  • Article PDF can be printed
USD 61.00 Add to cart

Issue Purchase

  • 30 days online access to complete issue
  • Article PDFs can be downloaded
  • Article PDFs can be printed
USD 1,161.00 Add to cart

* Local tax will be added as applicable

Related Research

People also read lists articles that other readers of this article have read.

Recommended articles lists articles that we recommend and is powered by our AI driven recommendation engine.

Cited by lists all citing articles based on Crossref citations.
Articles with the Crossref icon will open in a new tab.