396
Views
23
CrossRef citations to date
0
Altmetric
Quality Control

ARL Performance of the Tukey's Control Chart

&
Pages 1904-1913 | Received 04 Apr 2007, Accepted 09 Jun 2008, Published online: 01 Oct 2008
 

Abstract

A Tukey's control chart was designed to monitor single observation data. Its easy control-limits setting and simple statistical concept are the most important advantages. In this study, we setup the Tukey's control chart based on known probability distribution and construct its average run length calculator. ARL performance of the Tukey's control chart is evaluated under a normal distribution and non normal distributions, respectively. The comparison of ARL performance reveals that Tukey's control chart is not sensitive to shift detection when the process heavily violates the normal assumption. The number of observations needed for Tukey's control chart setup is less than Shewhart's control chart. Tukey's control chart is a better choice for the process mean monitoring.

Mathematics Subject Classification:

Log in via your institution

Log in to Taylor & Francis Online

PDF download + Online access

  • 48 hours access to article PDF & online version
  • Article PDF can be downloaded
  • Article PDF can be printed
USD 61.00 Add to cart

Issue Purchase

  • 30 days online access to complete issue
  • Article PDFs can be downloaded
  • Article PDFs can be printed
USD 1,090.00 Add to cart

* Local tax will be added as applicable

Related Research

People also read lists articles that other readers of this article have read.

Recommended articles lists articles that we recommend and is powered by our AI driven recommendation engine.

Cited by lists all citing articles based on Crossref citations.
Articles with the Crossref icon will open in a new tab.