ABSTRACT
In this paper, two control charts based on the generalized linear test (GLT) and contingency table are proposed for Phase-II monitoring of multivariate categorical processes. The performances of the proposed methods are compared with the exponentially weighted moving average-generalized likelihood ratio test (EWMA-GLRT) control chart proposed in the literature. The results show the better performance of the proposed control charts under moderate and large shifts. Moreover, a new scheme is proposed to identify the parameter responsible for an out-of-control signal. The performance of the proposed diagnosing procedure is evaluated through some simulation experiments.
Acknowledgement
The authors are thankful to the anonymous reviewers for precious and constructive comments which led to significant improvement in the paper.