386
Views
21
CrossRef citations to date
0
Altmetric
ORIGINAL ARTICLES

Multi-product lot sizing and scheduling on unrelated parallel machines

, , &
Pages 514-524 | Received 01 Dec 2007, Accepted 01 Nov 2009, Published online: 30 Apr 2010
 

Abstract

This article studies a problem of optimal scheduling and lot sizing a number of products on m unrelated parallel machines to satisfy given demands. A sequence-dependent setup time is required between lots of different products. The products are assumed to be all continuously divisible or all discrete. The criterion is to minimize the time at which all the demands are satisfied, C max, or the maximum lateness of the product completion times from the given due dates, L max. The problem is motivated by the real-life scheduling applications in multi-product plants. The properties of optimal solutions, NP-hardness proofs, enumeration, and dynamic programming algorithms for various special cases of the problem are presented. A greedy-type heuristic is proposed and experimentally tested. The major contributions are an NP-hardness proof, pseudo-polynomial algorithms linear in m for the case, in which the number of products is a given constant and the heuristic. The results can be adapted for solving a production line design problem.

Log in via your institution

Log in to Taylor & Francis Online

PDF download + Online access

  • 48 hours access to article PDF & online version
  • Article PDF can be downloaded
  • Article PDF can be printed
USD 61.00 Add to cart

Issue Purchase

  • 30 days online access to complete issue
  • Article PDFs can be downloaded
  • Article PDFs can be printed
USD 202.00 Add to cart

* Local tax will be added as applicable

Related Research

People also read lists articles that other readers of this article have read.

Recommended articles lists articles that we recommend and is powered by our AI driven recommendation engine.

Cited by lists all citing articles based on Crossref citations.
Articles with the Crossref icon will open in a new tab.