Abstract
In this paper a model is developed for determining physical location of a repair and stockage facility at the first echelon together with optimal allocation of recoverable spares to each location in a two-echelon repair-inventory system to minimize the total expected system cost. An illustrative example is included to indicate the application of the model and the iterative methodology developed.