53
Views
14
CrossRef citations to date
0
Altmetric
ORIGINAL ARTICLES

Optimal and heuristic inspection schedules for multistage production systems

&
Pages 1063-1071 | Published online: 31 May 2007
 

Abstract

Consider a single inspection facility that can be quickly switched among multiple inspection tasks. It can be used (for example) for detecting malfunction (or down state) production stages in a multistage production system. We assume that a properly working (or up state) production stage moves to a down state in any period with fixed probability. The stage then stays down until it is inspected and immediately restored back to an up state. Our purpose is to schedule inspections among the different production stages so as to maximize the fraction of good items produced. An optimal inspection schedule for a two stage production system is provided. For the general case of more than two stages, four heuristics are compared. We conclude that the proposed dynamic schedule is easy to derive, always feasible, and outperforms the static schedules.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.