131
Views
29
CrossRef citations to date
0
Altmetric
ORIGINAL ARTICLES

Scheduling jobs on unrelated parallel machines to minimize regular total cost functions

&
Pages 153-159 | Received 01 Apr 1997, Accepted 01 Jul 1998, Published online: 27 Jul 2007
 

Abstract

In this paper we consider unrelated parallel machine scheduling problems that involve the minimization of regular total cost functions. We first present some properties of optimal solutions and then provide a lower bound. These mechanisms are tested on the well-known practical problem of minimizing total weighted flow time on unrelated parallel machines. In doing so, we design a branch and bound algorithm incorporating the mechanisms derived for the general total cost function along with the ones derived specifically for the total weighted flow time criterion. Computational experience indicates that incoiporating reduction and bounding mechanisms significantly improves the performance of the branch and bound algorithm.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.