1,557
Views
0
CrossRef citations to date
0
Altmetric
Correction

Correction

This article refers to:
A retrospective analysis of Laos’s Nam Theun 2 Dam

Article title: A retrospective analysis of Laos’s Nam Theun 2 Dam

Authors: Scudder, T.

Journal: International Journal of Water Resources Development

DOI: https://doi.org/10.1080/07900627.2019.1677456

When the above article was first published online, the following sentence on p. 2 was incorrectly written: ‘Another pioneering aspect associated with NT2 was a four-volume concession agreement (Nam Theun 2 Hydroelectric Power Project Concession Agreement, 2005) the government of Laos signed in 1993 and the World Bank signed in 1995.’

The corrected sentence should be as follows: ‘Another pioneering aspect associated with NT2 was a four-volume concession agreement (Nam Theun 2 Hydroelectric Power Project Concession Agreement, 2005) the government of Laos signed in 2003 and the World Bank signed in 2005.’

This article is available both online and in print. The print and online versions have been corrected.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.