195
Views
11
CrossRef citations to date
0
Altmetric
Articles

Simulation-based scheduling of assembly operations

&
Pages 325-333 | Received 18 Dec 2007, Accepted 22 Mar 2008, Published online: 06 Apr 2009
 

Abstract

The production of large-sized machines or facilities is fundamentally different from the usual manufacturing processes. Mostly it is a fixed-site production, dominated by typical assembly processes instead of linear operation sequences in the known flow shop or job shop problems. To describe these processes, several graph methods were developed in the past, i.e. AND/OR-graphs or modified Petri nets, but most of them are static methods and they are not suitable for scheduling tasks. This paper demonstrates how Timed AND/OR-graphs can be modelled with a common discrete event simulation (DES) system. The objective is a simulation-based scheduling system for assembly processes which is able to improve the prediction of due date keeping as well as to optimise the workflow of the assembly systems.

Acknowledgement

The research is funded by the German Federal Ministry of Education and Research.

Log in via your institution

Log in to Taylor & Francis Online

PDF download + Online access

  • 48 hours access to article PDF & online version
  • Article PDF can be downloaded
  • Article PDF can be printed
USD 61.00 Add to cart

Issue Purchase

  • 30 days online access to complete issue
  • Article PDFs can be downloaded
  • Article PDFs can be printed
USD 528.00 Add to cart

* Local tax will be added as applicable

Related Research

People also read lists articles that other readers of this article have read.

Recommended articles lists articles that we recommend and is powered by our AI driven recommendation engine.

Cited by lists all citing articles based on Crossref citations.
Articles with the Crossref icon will open in a new tab.