In this paper, a simulation experiment has been developed to examine the combined influence of the design, inventory and environmental factors on the cost performance of a rolling horizon master production schedule. Specifically, a 2 5 factorial design was used to examine the effects associated with three rolling schedule design policies, one inventory policy and one environmental condition of forecast error on MPS cost performance. The study was based on actual data from a paint company. Results suggest that the choice of appropriate lot-size and inventory policies have a significant influence on MPS costs and that there are indeed important interactions between these policies and other design factors of a rolling schedule.
Rolling horizon master production schedule performance: A policy analysis
Reprints and Corporate Permissions
Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?
To request a reprint or corporate permissions for this article, please click on the relevant link below:
Academic Permissions
Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?
Obtain permissions instantly via Rightslink by clicking on the button below:
If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.
Related Research Data
Related research
People also read lists articles that other readers of this article have read.
Recommended articles lists articles that we recommend and is powered by our AI driven recommendation engine.
Cited by lists all citing articles based on Crossref citations.
Articles with the Crossref icon will open in a new tab.