Publication Cover
Production Planning & Control
The Management of Operations
Volume 12, 2001 - Issue 8
583
Views
25
CrossRef citations to date
0
Altmetric
Original Articles

Evaluation of safety stock methods in multilevel material requirements planning (MRP) systems

Pages 794-803 | Published online: 15 Nov 2010
 

This paper evaluates alternative methods of establishing the safety stock level taking into consideration of historical measures of forecasting accuracy and the needs for master production scheduling and material requirement planning under a rolling time horizon. A computer model is used to simulate the forecasting, master production scheduling and material planning activities in a company that produces to stock and the production activities are managed by multilevel MRP systems. The simulation output is analysed to evaluate the impact of safety stock methods on MRP system performance. The result of the study shows that using safety stock can help to reduce total cost, schedule instability and improve service level in the MRP systems. Guidelines are developed to help managers select methods to determine safety stock in MRP system operations.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.