Publication Cover
Production Planning & Control
The Management of Operations
Volume 13, 2002 - Issue 8
125
Views
5
CrossRef citations to date
0
Altmetric
Original Articles

Optimal dispatching control of an AGV in a JIT production system

, &
Pages 746-753 | Published online: 14 Nov 2010
 

This paper deals with an FMS (Flexible Manufacturing System) in a JIT (Just-In-Time) production system. The FMS consists of m workstations, one dispatching station and a single AGV (Automated Guided Vehicle). Each workstation has an input buffer of limited capacity and its processing times are distributed stochastically. When the processing of a new component starts at the workstation, a withdrawal Kanban attached to it is sent to the dispatching station. The AGV chooses one from workstations whose withdrawal Kanbans are accumulated at the dispatching station, and conveys a component with a withdrawal Kanban from the dispatching station to the workstation. The main purpose of this paper is to find an optimal dispatching policy of the AGV that maximizes the long-run expected average reward per unit time. The problem is formulated as a semi-Markov decision process and an optimal dispatching policy is computed. Numerical experiments are performed to make several comparisons.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.