Publication Cover
Production Planning & Control
The Management of Operations
Volume 22, 2011 - Issue 4
199
Views
4
CrossRef citations to date
0
Altmetric
Original Articles

Scheduling of raw-material unloading from ships at a steelworks

, , , , , , , & show all
Pages 389-402 | Received 29 Nov 2007, Accepted 10 Mar 2010, Published online: 21 Sep 2010
 

Abstract

Formulating a schedule for unloading raw material from ships at the seaport of a steelworks is a difficult task. Even in its simplest possible form, finding an optimum solution for the problem is nondeterministic polynomial time (NP)-hard. The problem at a steelworks gets more complicated due to several factors, such as the difference in capacities of unloading equipment, the requirement of keeping ships balanced and the dynamic nature of berthing eligibility of each ship, as governed by the weight of the remaining payload. Moreover, the raw material must be transported through a network of belt conveyor units to designated storage yards while being discharged from ships. The combinatorial nature of this belt conveyor operation is analysed in this article. A heuristic approach to the raw-material unloading problem is proposed and its effectiveness was tested with real-world examples.

Log in via your institution

Log in to Taylor & Francis Online

PDF download + Online access

  • 48 hours access to article PDF & online version
  • Article PDF can be downloaded
  • Article PDF can be printed
USD 61.00 Add to cart

Issue Purchase

  • 30 days online access to complete issue
  • Article PDFs can be downloaded
  • Article PDFs can be printed
USD 242.00 Add to cart

* Local tax will be added as applicable

Related Research

People also read lists articles that other readers of this article have read.

Recommended articles lists articles that we recommend and is powered by our AI driven recommendation engine.

Cited by lists all citing articles based on Crossref citations.
Articles with the Crossref icon will open in a new tab.