232
Views
8
CrossRef citations to date
0
Altmetric
Original Articles

Is the scheduling task context-dependent? A survey investigating the presence of constraints in different manufacturing contexts

, &
Pages 753-760 | Received 24 Apr 2015, Accepted 21 Aug 2015, Published online: 11 Apr 2016
 

Abstract

Most studies regarding real scheduling constraints only consider the constraints related to the specific manufacturing environment studied, limiting the possibility of drawing general conclusions. A survey of 50 companies was conducted in order to discover which constraints were present and what their relationship was with the scheduling context. This paper investigates which practical scheduling constraints are present in the manufacturing industry and whether the scheduling task is context-dependent. Results of this study show that some practical production constraints are context-dependent.

Log in via your institution

Log in to Taylor & Francis Online

PDF download + Online access

  • 48 hours access to article PDF & online version
  • Article PDF can be downloaded
  • Article PDF can be printed
USD 61.00 Add to cart

Issue Purchase

  • 30 days online access to complete issue
  • Article PDFs can be downloaded
  • Article PDFs can be printed
USD 242.00 Add to cart

* Local tax will be added as applicable

Related Research

People also read lists articles that other readers of this article have read.

Recommended articles lists articles that we recommend and is powered by our AI driven recommendation engine.

Cited by lists all citing articles based on Crossref citations.
Articles with the Crossref icon will open in a new tab.