Job route selection model for workload balancing between workstations in flexible flow line

Pages 430-438 | Published online: 27 Apr 2007
 

Abstract

A flexible flow line (FFL) consists of several groups of identical machines. All work-orders flow along the same path through successive machine groups. Thus, the balancing of workloads between machine groups in order to maximize total productivity is emphasized. On the other hand, many different types of work-orders, in varying batch or lot sizes, are produced simultaneously. The mix of work-orders, their lot sizes, and the sequence in which they are produced affect the workload. However, the work-orders and their lot sizes are pre-fixed and cannot be changed. Because of these reasons, an optimal route selection model has been developed using heuristic search and a min-max algorithm for balancing the workload between machine groups in the FFL.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.