1,592
Views
38
CrossRef citations to date
0
Altmetric
research

Handover defects: comparison of construction and post-handover housing defects

, , &
Pages 279-288 | Published online: 20 May 2015
 

Abstract

Although inspections occur during construction or at handover, customers do not normally participate. This situation creates a gap between the quality perceived by both contractors and customers. An analysis of 52 552 handover defects in 2179 flats in Spain is presented which identified their nature, the building element and trade where these defects are located. These results are compared with previous studies that analysed defects detected during the construction stage and those that remain after handing over the building to the client. The research reveals that structural defects are resolved during construction due to existing quality standards. However, other aesthetic and functional defects remain and/or arise at handover. Some defects are not resolved until customers complain after they first occupy the dwelling. Many functional defects arise due to the lack of involvement of end users in the early project stages.

Log in via your institution

Log in to Taylor & Francis Online

PDF download + Online access

  • 48 hours access to article PDF & online version
  • Article PDF can be downloaded
  • Article PDF can be printed
USD 53.00 Add to cart

Issue Purchase

  • 30 days online access to complete issue
  • Article PDFs can be downloaded
  • Article PDFs can be printed
USD 665.00 Add to cart

* Local tax will be added as applicable

Related Research

People also read lists articles that other readers of this article have read.

Recommended articles lists articles that we recommend and is powered by our AI driven recommendation engine.

Cited by lists all citing articles based on Crossref citations.
Articles with the Crossref icon will open in a new tab.