23
Views
0
CrossRef citations to date
0
Altmetric
Original Articles

An inventory policy of inspection and setup cost on the integrated production-inventory system for flawed items

, &
Pages 209-220 | Received 01 Aug 2003, Published online: 14 Jun 2013
 

Abstract

Almost all inventory models assume that setup cost is deterministic, and thus is not subject to control. However, in many practical situations, setup cost can be reduced at added cost, this article combines the concept of capital investment allocated to reducing the setup cost to determine an optimal integrated vendor-buyer inventory policy for flawed items in a just-in-time (JIT) manufacturing environment. The objective is to minimize the total joint annual costs incurred by the vendor and the buyer. The production process is assumed to deteriorate during processing and produces a certain number of defective items. The expected annual integrated total cost function is derived and a solution procedure is established to find out the optimal solution. Finally, the solution technique is illustrated with a numerical example available in the literature.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.