32
Views
0
CrossRef citations to date
0
Altmetric
Original Articles

Fuzzy Production Scheduling for JIT Manufacturing

&
Pages 319-329 | Published online: 24 Oct 2013
 

ABSTRACT

Production scheduling for a flexible manufacturing environment operating under just-in-time involves solving for a different set of criteria compared with the traditional job-shop model. Practical considerations coupled with customer service orientation prevalent in modem organizations today require a scheduling system ensuring as far as possible that goods are delivered on time yet still maintain efficient use of resources within the manufacturing cells. Thus the multi-criteria problem is difficult to solve using existing heuristics without means to combine these rules and weight them accordingly. Furthermore, the ideal scheduling package will also take into consideration the interactions between resource and component to assist in optimal process planning. A revised scheduling system incorporating fuzzy logic to solve the multi criteria problem is proposed. In addition, the system is designed to be implemented using readily available software tools and through the use of fuzzy systems, able to be tailored to suit the characteristics of the target organization.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.