Publication Cover
Journal of Environmental Science and Health, Part A
Toxic/Hazardous Substances and Environmental Engineering
Volume 42, 2007 - Issue 2
272
Views
18
CrossRef citations to date
0
Altmetric
ARTICLES

Removal of aluminium by constructed wetlands with water hyacinth (Eichhornia crassipes (Mart.) Solms) grown under different nutritional conditions

, , &
Pages 185-193 | Received 05 May 2006, Published online: 02 Mar 2007
 

Abstract

This article reports the phytoremediation efficiencies of water hyacinth (Eichhornia crassipes (Mart.) Solms) grown under different nutritional conditions for Al rich wastewaters in batch type constructed wetlands (floating aquatic macrophyte-based plant treatment systems). This study was conducted for 15 weeks after 1 week acclimatization by culturing young water hyacinth (average height of 20 ± 2 cm) in 590 L capacity fiberglass tanks under different nutrient concentrations of 2-fold [56 and 15.4 mg/L of total nitrogen (TN) and total phosphorous (TP), respectively], 1-fold, 1/2-fold, 1/4-fold and 1/8-fold with synthetic wastewaters containing 5.62 Al mg/L. A control set-up of hyacinths comprising only Al with no nutrients was also studied. A mass balance was carried out to investigate the phytoremediation efficiencies and to identify the different Al removal mechanisms from the wastewaters. Chemical precipitation of Al(OH)3 was a dominant contribution to Al removal at the beginning of the study, whereas adsorption of Al3+ to sediments was observed to be a predominant Al removal mechanism as the study progressed. Phytoremediation mainly due to rhizofiltration was also an important mechanism of Al removal especially during the first 4 weeks of the study in almost all the set-ups. However, chemical precipitation and sediment adsorption of Al3 + was a dominant contribution to Al removal in comparison with phytoremediation. Plants cultured in the control set-up showed the highest phytoremediation efficiency of 63% during the period of the 4th week. A similar scenario was evident in the 1/8-fold set-up. Hence we conclude that water hyacinth grown under lower nutritional conditions are more ideal to commence a batch type constructed wetland treating Al rich wastewaters with a hydraulic retention time of approximately 4 weeks, after which a complete harvesting is recommended.

Acknowledgments

We would like to give our sincere thanks to the Swedish International Development Cooperation Agency (Sida) for their financial assistance for this research and the Asian Institute of Technology (AIT), Thailand for coordinating this research. Very special thanks are given to Mr. Sudesh Gunasekara, Mr. P.D.C. Botheju, Ms. Anusha Kasige, Mr. Justin Silva, Ms. P.U.D. Fernando and Ms. R. Semasinghe for their assistance on numerous works.

Log in via your institution

Log in to Taylor & Francis Online

PDF download + Online access

  • 48 hours access to article PDF & online version
  • Article PDF can be downloaded
  • Article PDF can be printed
USD 61.00 Add to cart

Issue Purchase

  • 30 days online access to complete issue
  • Article PDFs can be downloaded
  • Article PDFs can be printed
USD 709.00 Add to cart

* Local tax will be added as applicable

Related Research

People also read lists articles that other readers of this article have read.

Recommended articles lists articles that we recommend and is powered by our AI driven recommendation engine.

Cited by lists all citing articles based on Crossref citations.
Articles with the Crossref icon will open in a new tab.