Destruction of the Contract through Material Changes

Pages 43-51 | Published online: 23 Feb 2007
 

ABSTRACT

This paper introduces the term ‘destruction of the contract’ to describe the various legal theories which can be used when the number of changes to a construction contract is so great the owner is considered to have legally destroyed the original contract. The advantage to the contractor, and disadvantage to the owner, of these doctrines is the contractor is not paid according to the original contract, but under the theories of promissory estoppel and/or quantum meruit, that is: the reasonable value of the work performed. This amount is usually higher than the contract amount. Contractors wishing to use this theory should reserve their rights when performing material changes on the project and the owner does not recognize the reasonable costs for those material changes.

Log in via your institution

Log in to Taylor & Francis Online

PDF download + Online access

  • 48 hours access to article PDF & online version
  • Article PDF can be downloaded
  • Article PDF can be printed
USD 53.00 Add to cart

Issue Purchase

  • 30 days online access to complete issue
  • Article PDFs can be downloaded
  • Article PDFs can be printed
USD 404.00 Add to cart

* Local tax will be added as applicable

Related Research

People also read lists articles that other readers of this article have read.

Recommended articles lists articles that we recommend and is powered by our AI driven recommendation engine.

Cited by lists all citing articles based on Crossref citations.
Articles with the Crossref icon will open in a new tab.