267
Views
4
CrossRef citations to date
0
Altmetric
Articles

Integrated Resource Planning for Long-term Electricity Supply in Selected GMS Countries, Part 2: Environmental and Economic Impacts

&
Pages 340-347 | Published online: 12 Jan 2015
 

Abstract

This research article presents the potential of integrated resource planning (IRP) options for long term electricity supply in selected Greater Mekong Subregion (GMS) countries, namely Cambodia, Laos, Thailand, and Vietnam. Results from Part 1 show the achievement of the IRP context in GMS. The mitigation scenario would improve the quality of electricity supply and mitigate CO2 emissions from the power sector. At the same time, the renewable energy (RE) scenario has the highest total generation cost. However, to make the renewable energy technologies competitive with fossil fuels, incentives in terms of carbon credit are taken into account. Results of this study were analyzed by using the Long-range Energy Alternative Planning system model. Results reveal that under the IRP concept, the selected GMS countries could mitigate CO2 emissions by about 61.16 million tonnes when compared to the business as usual (BAU) scenario by 2030. In the meantime, under incentive cost in the RE scenario, the total generation would be reduced by 2.3% when compared to the BAU scenario.

Log in via your institution

Log in to Taylor & Francis Online

PDF download + Online access

  • 48 hours access to article PDF & online version
  • Article PDF can be downloaded
  • Article PDF can be printed
USD 61.00 Add to cart

* Local tax will be added as applicable

Related Research

People also read lists articles that other readers of this article have read.

Recommended articles lists articles that we recommend and is powered by our AI driven recommendation engine.

Cited by lists all citing articles based on Crossref citations.
Articles with the Crossref icon will open in a new tab.