An Economic Model for the Revamping of a Pulverized Coal-fired Boiler

Pages 307-313 | Received 10 Dec 2010, Accepted 31 Dec 2010, Published online: 16 Oct 2013
 

Abstract

Equipping existing thermal power plants (TPPs) with newer technologies, such as fluidized bed combustion (FBC), is vital for many countries due to concerns about the economy, the environment, and energy policy. First, this study presents a general model for economic analysis of the revamping of a pulverized coal-fired boiler with FBC. Second, the developed model is applied to a 140 MW pulverized coal-fired TPP. Third, the payback period (PBP) is calculated by using the net present value (NPV) method. Finally, the effects of almost all technical and economic parameters, such as power loss, electricity price, and escalation rate are investigated on PBP and NPV. As a result, the outcomes of this study show that power loss has a significant effect on PBP and NPV.

Log in via your institution

Log in to Taylor & Francis Online

PDF download + Online access

  • 48 hours access to article PDF & online version
  • Article PDF can be downloaded
  • Article PDF can be printed
USD 61.00 Add to cart

* Local tax will be added as applicable

Related Research

People also read lists articles that other readers of this article have read.

Recommended articles lists articles that we recommend and is powered by our AI driven recommendation engine.

Cited by lists all citing articles based on Crossref citations.
Articles with the Crossref icon will open in a new tab.