An improved fuzzy critical chain approach in order to face uncertainty in project scheduling

, ORCID Icon &
Pages 1-13 | Published online: 20 Jan 2017
 

ABSTRACT

This paper proposes an improved critical chain method with fuzzy approach to schedule projects under uncertainty. Utilizing fuzzy numbers can be wise because of the natural uncertainty in estimation of required work to accomplish the project tasks. To minimize the project duration as an objective taking into account resource limitations and other constrains, a resource-constrained project scheduling problem (RCPSP) model is adopted. The output of this model determines the project schedule. Then, a new buffer sizing approach based on the square root of the sum of the squares (SSQ) method is introduced which is modified by coefficients to overcome the schedule risk more efficiently. As a result, a project buffer is added to the end of the project schedule and is used if necessary. The methodology can be used as a control procedure.

Disclosure statement

No potential conflict of interest was reported by the authors.

Log in via your institution

Log in to Taylor & Francis Online

PDF download + Online access

  • 48 hours access to article PDF & online version
  • Article PDF can be downloaded
  • Article PDF can be printed
USD 61.00 Add to cart

Issue Purchase

  • 30 days online access to complete issue
  • Article PDFs can be downloaded
  • Article PDFs can be printed
USD 158.00 Add to cart

* Local tax will be added as applicable

Related Research

People also read lists articles that other readers of this article have read.

Recommended articles lists articles that we recommend and is powered by our AI driven recommendation engine.

Cited by lists all citing articles based on Crossref citations.
Articles with the Crossref icon will open in a new tab.