Case-based insights into rework costs of residential building projects in China

, , , &
Pages 347-355 | Published online: 24 Sep 2018
 

Abstract

Rework has been identified as a major cause of cost overran of residential building projects. This study aims to investigate the magnitude of rework costs generated by different sources for residential building projects in China. Six residential building projects were selected as sample cases; rework activities and their detailed cost information were collected and analysed. The result revealed that average rework cost of residential building projects was 4.95% of the total project cost. The majority of rework costs were generated by three sources including contractor field management (20.10%), design management (18.91%) and client management (14.73%). It was also found that the main liability bearers of rework costs did not take corresponding responsibilities. The establishment of rework costs allocation mechanism is therefore required to enhance the sense of responsibility among different entities. The magnitude of rework cost may well motivate them take collaborative actions to reduce rework cost. This article provides valuable empirical data for practitioners to understand the major sources of rework costs and main liability-bearers. Therefore, practitioners can take targeted measures to address certain key factors that cause rework based on the data. Above all, this study will bring benefit to the construction industry as well as the whole society.

Acknowledgements

We would also like to show our gratitude to Prof. Liyin Shen for providing insight and expertise that greatly assisted the research.

Disclosure statement

No potential conflict of interest was reported by the authors.

Additional information

Funding

This work was supported by the National Natural Science Foundation of China (grant number 71471023); Fundamental Research Funds for the Central Universities (grant number 106112016CDJSK03XK07); Modern Project Management Research Center of Chongqing University (grant number 2017CDJSK03PT03) and International Research Center for Sustainable Built Environment (grant number 2018 CDJSK03PT17) and Research Center of Construction Economics and Management.

Log in via your institution

Log in to Taylor & Francis Online

PDF download + Online access

  • 48 hours access to article PDF & online version
  • Article PDF can be downloaded
  • Article PDF can be printed
USD 61.00 Add to cart

Issue Purchase

  • 30 days online access to complete issue
  • Article PDFs can be downloaded
  • Article PDFs can be printed
USD 158.00 Add to cart

* Local tax will be added as applicable

Related Research

People also read lists articles that other readers of this article have read.

Recommended articles lists articles that we recommend and is powered by our AI driven recommendation engine.

Cited by lists all citing articles based on Crossref citations.
Articles with the Crossref icon will open in a new tab.