Crashing construction projects considering schedule flexibility: an illustrative example

, &
Pages 619-628 | Published online: 22 Mar 2021
 

Abstract

Time and cost are two of the most important performance indicators of construction projects. Project crashing is one of the effective methods for solving time-cost trade-off problems. However, in some instances, consuming all of the crash durations of the activities may lead to inflexible schedules. This paper proposes a project crashing model that aims to achieve more flexible schedules by means of assigning a crash duration consumption rate to each activity based on the preferred scheduling strategy. The applicability of the proposed model is presented along with an illustrative example. The Monte Carlo simulation is also performed to verify whether the proposed model is useful or not. The results revealed that the proposed model is an effective tool as it maintains schedule flexibility and increases the probability of completing the project in the targeted project duration. The proposed model also provides a new perspective for schedulers to solve project crashing problems.

Disclosure statement

No potential conflict of interest was reported by the authors.

Log in via your institution

Log in to Taylor & Francis Online

PDF download + Online access

  • 48 hours access to article PDF & online version
  • Article PDF can be downloaded
  • Article PDF can be printed
USD 61.00 Add to cart

Issue Purchase

  • 30 days online access to complete issue
  • Article PDFs can be downloaded
  • Article PDFs can be printed
USD 158.00 Add to cart

* Local tax will be added as applicable

Related Research

People also read lists articles that other readers of this article have read.

Recommended articles lists articles that we recommend and is powered by our AI driven recommendation engine.

Cited by lists all citing articles based on Crossref citations.
Articles with the Crossref icon will open in a new tab.