Sediment management studies of a run-of-the-river hydroelectric project using numerical and physical model simulations

&
Pages 165-175 | Received 19 May 2015, Accepted 01 Sep 2015, Published online: 25 Feb 2016
 

ABSTRACT

Run-of-the-river hydropower projects are developed based on the concept of sustaining reservoir life by sediment management. Sediment management is achieved by sluicing or drawdown flushing through low-level spillways. Simulations with numerical and physical models are essential for optimizing the design and operation of such projects. In this paper, numerical and physical model simulations carried out for sediment management of a run-of-the-river hydropower project are presented. For Devsari Hydroelectric Project, Uttarakhand, India, a physical model was constructed to a geometrically similar scale of 1: 60. Experiments were carried out for sediment management for various scenarios. One-dimensional model Hydrologic Engineering Center's –River Analysis System was used to simulate the longitudinal sedimentation and velocity profiles in the physical model. The numerical model was further applied to the prototype for predicting the long-term sediment deposition along the reservoir stretch. Results of the simulation indicated deltaic sediment deposition in the upstream reaches of the main Pinder and Kailganga rivers. The delta advanced towards downstream for lower reservoir operation levels. The flow velocities in the entire reservoir stretch were observed to be very low, thus confirming the design concept of reservoir functioning as a desilting basin. Experiments were carried out on the physical model for simulating sediment removal by drawdown flushing. It was observed that reservoir capacity can be restored by annual flushing during peak flows. Flushing with discharge of 300 m3/s for 12 h duration can remove about 0.0086 Mm3 of sediment and hence may be adopted for reservoir operation.

Acknowledgements

Kind permission given by Shri. S. Govindan, Director CWPRS, Pune, India, for publishing the paper is acknowledged with thanks. Support and input given by Shri K. L. Aumta, AGM, SJVN Limited, Shimla, and Dr (Mrs) V. V. Bhosekar, Joint director, CWPRS, are thankfully acknowledged. Authors also express thanks to officers and staff members of river engineering group: Shri. B. Sureshkumar, Shri. P. S. Kunjeer and Shri. P. D. Patil (Research Officers) and Shri. S. A. Kamble, Shri. F. D. Momin and Mrs Snehal B. Tayade (Assistant Research Officers), for their co-operation in constructing the model, conducting the studies and preparing the manuscript.

Disclosure statement

No potential conflict of interest was reported by the authors.

Log in via your institution

Log in to Taylor & Francis Online

PDF download + Online access

  • 48 hours access to article PDF & online version
  • Article PDF can be downloaded
  • Article PDF can be printed
USD 61.00 Add to cart

Issue Purchase

  • 30 days online access to complete issue
  • Article PDFs can be downloaded
  • Article PDFs can be printed
USD 144.00 Add to cart

* Local tax will be added as applicable

Related Research

People also read lists articles that other readers of this article have read.

Recommended articles lists articles that we recommend and is powered by our AI driven recommendation engine.

Cited by lists all citing articles based on Crossref citations.
Articles with the Crossref icon will open in a new tab.