128
Views
0
CrossRef citations to date
0
Altmetric
Correction

Correction

Article: e2344991 | Published online: 28 Apr 2024
This article refers to:
A BIM-enabled robot control system for automated integration between rebar reinforcement and 3D concrete printing

Article title: A BIM-Enabled Robot Control System for Automated Integration between Rebar Reinforcement and 3D Concrete Printing

Authors: Song Dua*, Fei Tenga*, Zicheng Zhuanga, Dong Zhangb, Mingyang Lic, Heng Lia and Yiwei Wenga

Journal: Virtual and Physical Prototyping

DOI: 10.1080/17452759.2024.2332423

When the article was first published, the authors have identified the error that were inadvertently introduced to the figures, and this affected some of the results. In order to rectify the error, the following changes have been made to the article.

A correction has been made on page 6 of the PDF, the Figure 3 appears three times and on page 14, the figure and caption of Figure 14 has overlapped.

 

Published Figure: Figure 3

Replaced Figure: Figure 3

 

Published Figure: Figure 14

 

Replaced Figure: Figure 14

 

The figure 3 has been updated with correct figure and the figure and caption of Figure 14 has been positioned correctly and published online.

Fig. 14. Distance from the vertical rebar to the infill printing path.

Fig. 14. Distance from the vertical rebar to the infill printing path.

Fig. 14. Distance from the vertical rebar to the infill printing path.

Fig. 14. Distance from the vertical rebar to the infill printing path.