Shahram Mollaiy-Berneti, A Hybrid Approach Based on the Combination of Adaptive Neuro-Fuzzy Inference System and Imperialist Competitive Algorithm: Oil Flow Rate of the Wells Prediction Case Study, International Journal of Computational Intelligence Systems, 6 (2), 2013, p. 198-208.
Since publication of the original version of record on January 22, 2013, this article has undergone the following corrections:
• | The author's name originally appeared as Shahram Mollaiy Berneti. It has subsequently been replaced with Shahram Mollaiy-Berneti. | ||||
• | In the information for authors, the word Sari originally appeared. This has now been removed. | ||||
• | p. 198, col. 1, para. 1, line 1: the word “parameters” has now been changed to “parameter”. | ||||
• | p. 198, col. 2, para. 1, line 8: the word “ways” has now been changed to “way”. | ||||
• | p. 198, col. 2, para. 1, line 10: “rule” has now been changed to “role”. | ||||
• | p. 198, col. 2, para. 1, line 11: “is” has now been changed to “are”. | ||||
• | p. 198, col. 2, para. 1, line 12: “sensor” has now been changed to “sensors”. | ||||
• | p. 199, col. 1, para. 1, line 15: “NN” has now been changed to “neural networks”. | ||||
• | p. 199, col. 1, para. 2, end of line 11: “,” has now been changed to “and”. | ||||
• | p. 200, col. 1, para. 1, line 1: | ||||
• | In Eq. 5, (p. 200) | ||||
• | p. 200, col. 2, line 1: “is the output” has now been changed to “is the ith node's output”. | ||||
• | p. 201, col. 2, para. 3, line 6: “divide” has now been changed to “are divided”. | ||||
• | In Equations 15, 16 and 17 (p. 201) “P, R and D=P-R” has now been changed to “P, R and D=P-R”. | ||||
• | p. 202, col. 2, para. 5, line 1: “will be exists” has now been changed to “will exist”. | ||||
• | p. 202, col. 2, para. 6, line 3: “by using the” has now been changed to “using”. | ||||
• | p. 202, col. 2, para. 6, line 4: “are” has now been changed to “was”. | ||||
• | p. 203, col. 1, para. 1, line 3: “are normalized” has now been changed to “were normalized”. | ||||
• | p. 204, col. 2, para. 2, line 1: “efficiency coefficient ( 2 R)” has now been changed to “correlation coefficient (R)”. | ||||
• | p. 205, col. 2, para. 1, line 17: “efficiency coefficient” has now been changed to “correlation coefficient”. | ||||
• | In Fig. 9 and 10, and Table 1 “ 2 R ” has now been changed to “R”. | ||||
• | In Ref. 21, “195-20” has now been changed to “195-200”. | ||||
• | In Ref. 22, “665-85” has now been changed to “665-685”. | ||||
• | In Ref. 23, “116-32” has now been changed to “116-132”. |