469
Views
20
CrossRef citations to date
0
Altmetric
Original Articles

Analysis on deformation and structural safety of a novel concrete-filled steel tube support system in loess tunnel

, , &
Pages 39-59 | Received 15 Oct 2016, Accepted 20 Aug 2018, Published online: 01 Mar 2019
 

Abstract

Because the conventional support system has its own limitations, it is hard to stabilize the surrounding soil which frequently causes the tunnel damage in loess area. Therefore, there has been aroused a great concern for controlling the large deformation during loess tunnel construction. Based on a successful application of the concrete-filled steel tube (CFST) in mining engineering, a novel support type of CFST support system is proposed in this article. The new support system highlights to strengthen the primary lining and to improve the stress distribution between primary and secondary lining. The convergence confinement method and finite element analysis were adopted to investigate the performance of CFST support system and conventional support system, respectively. The results showed that CFST support system presented a better support performance with higher stiffness and greater bearing capacity compared with the conventional support system. In addition, CFST support system effectively decreased the tunnel deformation and extensively increased the safety reserve of secondary lining during the tunneling process. Also, a parametric study was conducted and included investigations on the inner concrete strength, the thickness of the steel tube and the diameter of the CFST. These results help to improve the loess tunnel design and construction.

Disclosure statement

No potential conflict of interest was reported by the authors.

Additional information

Funding

This work was supported by the Brainstorm Project on Social Development of Shaanxi Provincial Science and Technology Department (Grant No. 2016SF-412), the Special Fund for Basic Scientific Research of Central Colleges of Chang’an University (Grant No. 310821172004, No. 310821153312, No. 310821165011) and the National Key R&D Program of China (Grant No. 2018YFC0808606).

Log in via your institution

Log in to Taylor & Francis Online

PDF download + Online access

  • 48 hours access to article PDF & online version
  • Article PDF can be downloaded
  • Article PDF can be printed
USD 61.00 Add to cart

Issue Purchase

  • 30 days online access to complete issue
  • Article PDFs can be downloaded
  • Article PDFs can be printed
USD 229.00 Add to cart

* Local tax will be added as applicable

Related Research

People also read lists articles that other readers of this article have read.

Recommended articles lists articles that we recommend and is powered by our AI driven recommendation engine.

Cited by lists all citing articles based on Crossref citations.
Articles with the Crossref icon will open in a new tab.