840
Views
34
CrossRef citations to date
0
Altmetric
Original Articles

Statistical Control of a Six Sigma Process

&
Pages 587-592 | Published online: 15 Feb 2007
 

Abstract

Six Sigma as a methodology for quality improvement is often presented and deployed in terms of the dpmo metric, i.e., defects per million opportunities. As the sigma level of a process improves beyond three, practical interpretation problems could arise when conventional Shewhart control charts are applied during the Control phase of the define-measure-analyze-improve-control framework. In this article, some alternative techniques are described for the monitoring and control of a process that has been successfully improved; the techniques are particularly useful to Six Sigma Black Belts in dealing with high-quality processes. The approach used would thus ensure a smooth transition from a low-sigma process management to maintenance of a high-sigma performance in the closing phase of a Six Sigma project.

Acknowledgments

Log in via your institution

Log in to Taylor & Francis Online

PDF download + Online access

  • 48 hours access to article PDF & online version
  • Article PDF can be downloaded
  • Article PDF can be printed
USD 61.00 Add to cart

Issue Purchase

  • 30 days online access to complete issue
  • Article PDFs can be downloaded
  • Article PDFs can be printed
USD 694.00 Add to cart

* Local tax will be added as applicable

Related Research

People also read lists articles that other readers of this article have read.

Recommended articles lists articles that we recommend and is powered by our AI driven recommendation engine.

Cited by lists all citing articles based on Crossref citations.
Articles with the Crossref icon will open in a new tab.