Hybrid forecasting system based on case-based reasoning and analytic hierarchy process for cost estimation

Pages 86-96 | Received 05 Aug 2011, Accepted 27 Mar 2012, Published online: 16 Jan 2013
 

Abstract

Cost estimating of highway projects with high accuracy at the early stage of project development is crucial for planning and feasibility studies. Various research have been attempted to develop cost prediction models in the early stage of a construction life cycle. This study uses the hybrid estimating tool to provide an effective cost data management for highway projects and accordingly develops a realistic cost estimating system. This study focused on the development of a more accurate estimate technique for highway projects in South Korea at the early stage using hybrid analytic hierarchy process (AHP) and case-based reasoning (CBR). Real case studies are used to demonstrate and validate the benefits of the proposed approach. It is expected that the developed CBR system is to provide decision-makers with accurate cost information to asses and compare multiple alternatives for obtaining the optimal solution and controlling cost.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.