Evaluation of revegetation techniques for roadside construction sites

, &
Pages 305-315 | Received 19 Feb 2016, Accepted 27 Sep 2016, Published online: 20 Sep 2017
 

Abstract

Vegetation is often used to control erosion on right-of-way construction sites, but disturbed conditions provide challenges. This research evaluated the impact of common techniques for preparing seedbeds. The study assessed the use of topsoil, and the use of a hydraulic erosion-control product was compared to straw. Experimental seed mixtures were evaluated to understand how native and non-native seeds performed. The intent was to identify critical practices to use in general seeding and mulching specifications. A plot study was conducted comparing vegetation established during one growing season. Treatments included combinations of seed mixture, topsoil treatment, and mulch types. Three seed mixtures were considered: (1) currently used mixture, (2) a warm-season experimental mixture, and (3) a cool-season experimental mixture. Plots with topsoil and no topsoil were compared, and both straw and hydraulic erosion control products were considered. Ground cover, compaction, and biomass were evaluated. Results suggest that alternative seed mixtures that include native and low-threat-level species can provide adequate cover to meet permitting requirements in the first growing season. The warm-season seed mixture provided less cover than the other two mixtures after eight days, but no differences were determined in ground cover among the three seed mixtures at the end of the growing season. Initial germination was improved with hydraulic mulch, but long-term cover was equivalent between hydraulic and straw mulch. Topsoil application would not be recommended if the soil contains undesirable species, and the use of organic amendment products may be more desirable than topsoil alone; however, specifications need to allow the use of these products.

Additional information

Notes on contributors

George Hilvers

George HILVERS. He is a Civil Engineer at Langan Engineering and Environmental Services, Inc. He is a former Graduate Research Assistant in the Civil and Environmental Engineering Department at West Virginia University.

Leslie Hopkinson

Leslie HOPKINSON. She is an Associate Professor in Civil and Environmental Engineering at West Virginia University. Her research focus is in hydrology, streambank stability, reclamation, and stream restoration.

Eric Davis

Eric DAVIS. He is a Detailer / Project Manager for CEC Steel in Morgantown, West Virginia. He is a former Graduate Research Assistant in the Civil and Environmental Engineering Department at West Virginia University and completed two co-op positions with the West Virginia Division of Highways.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.