References
- AlidaeeBWomerNKScheduling with time dependent processing times: Review and extensionsJ Opl Res Soc19995071172010.1057/palgrave.jors.2600740
- BachmanAJaniakAMinimizing maximum lateness under linear deteriorationEur J Opl Res200012655756610.1016/S0377-2217(99)00310-0
- BachmanAJaniakAKovalyovMYMinimizing the total weighted completion time of deteriorating jobsInform Process Lett200281818410.1016/S0020-0190(01)00196-X
- BrowneSYechialiUScheduling deteriorating jobs on a single processorOpns Res19903849549810.1287/opre.38.3.495
- ChengTCEDingQThe complexity of single machine scheduling with release timesInform Process Lett199865757910.1016/S0020-0190(97)00195-6
- ChengTCEDingQSingle machine scheduling with step-deteriorating processing timesEur J Opl Res200113462363010.1016/S0377-2217(00)00284-8
- ChengTCEDingQScheduling start time dependent tasks with deadlines and identical initial processing times on a single machineComput Opns Res200330516210.1016/S0305-0548(01)00077-6
- ChengTCEDingQKovalyovMYBachmanAJaniakAScheduling jobs with piecewise linear decreasing processing timesNav Res Logist20035053155410.1002/nav.10073
- ChengTCEDingQLinBMTA concise survey of scheduling with time-dependent processing timesEur J Opl Res200415211310.1016/S0377-2217(02)00909-8
- FrenchSSequencing and Scheduling: An Introduction to the Mathematics of the Job-Shop1982
- GuoAXWangJBSingle machine scheduling with deteriorating jobs under the group technology assumptionInt J Pure Appl Math200518225231
- GuptaJNDGuptaSKSingle facility scheduling with nonlinear processing timesComput Ind Eng19881438739310.1016/0360-8352(88)90041-1
- GuptaSKKunnathurASDandapaniKOptimal repayment policies for multiple loansOmega19871532333010.1016/0305-0483(87)90020-X
- KunnathurASGuptaSKMinimizing the makespan with late start penalties added to processing times in a single facility scheduling problemEur J Opl Res199047566410.1016/0377-2217(90)90089-T
- MosheiovGScheduling jobs under simple linear deteriorationComput Opns Res19942165365910.1016/0305-0548(94)90080-9
- MosheiovGScheduling jobs with step-deterioration: Minimizing makespan on a single and multi-machineComput Ind Eng19952886987910.1016/0360-8352(95)00006-M
- NgCTChengTCEBachmanAJaniakAThree scheduling problems with deteriorating jobs to minimize the total completion timeInform Process Lett20028132733310.1016/S0020-0190(01)00244-7
- SundararaghavanPSKunnathurASingle machine scheduling with start time dependent processing time: Some solvable casesEur J Opl Res19947839440310.1016/0377-2217(94)90048-5
- WangJBXiaZQFlow shop scheduling with deteriorating jobs under dominating machinesOmega20063432733610.1016/j.omega.2004.10.006
- WangJBNgCTChengTCELiuLLMinimizing total completion time in a two-machine flow shop with deteriorating jobsAppl Math Comput2006180185193