References
- AgnihothriSRKenettRSThe impact of defects on a process with reworkEur J Opl Res19958030832710.1016/0377-2217(94)00173-A
- FlapperSDPTeunterRHLogistic planning of rework with deteriorating work-in-processInt J Prod Econ200488515910.1016/S0925-5273(03)00130-0
- FlapperSDPFransooJCBroekmeulenRACMInderfurthKPlanning and control of rework in the process industries: A reviewProd Plan Contr200213263410.1080/09537280110061548
- HsiehJCChangPCHsuLCScheduling of drilling operations in printed circuit board factoryComput Ind Eng20034446147310.1016/S0360-8352(02)00231-0
- KhoujaMMehrezAEconomic production lot size model with variable production rate and imperfect qualityJ Opl Res Soc1994451405141710.1057/jors.1994.217
- KimCHAn EMQ model with reworkJ Kor Inst Ind Eng200531173179
- KuhlMELaubischGRA simulation study of dispatching rules and rework strategies in semiconductor manufacturingProceedings of IEEE/SEMI Advanced Semiconductor Manufacturing Conference2004
- LeeDHKoHHKimSSA study of strategy for planning of rework in semiconductor monitoring burn in test processIE Interfaces200518350360
- LeeHLLot sizing to reduce capacity utilization in a production process with defective items, process corrections and reworkMngt Sci1992381314132810.1287/mnsc.38.9.1314
- LeeYHPinedoMScheduling jobs on parallel machines with sequence-dependent setup timesEur J Opl Res199710046447410.1016/S0377-2217(95)00376-2
- LiuJJYangPOptimal lot-sizing in an imperfect production system with homogeneous reworkable jobsEur J Opl Res19969151752710.1016/0377-2217(94)00339-4
- MakisVFungJAn EMQ model with inspections and random machine failuresJ Opl Res Soc199849667610.1057/palgrave.jors.2600484
- ShaDYHsuSYThe effects of rework on the shopfloor control in wafer fabricationJ Manuf Technol Mngt20041518419810.1108/09576060410513760
- ShaDYHsuSYCheZHChenCHA dispatching rule for photolithography scheduling with an online rework strategyComput Ind Eng20065023324710.1016/j.cie.2006.04.002
- ShinJSHanJYJeongBJComparative analysis of rework policies in multistage production systemJ Kor Inst Ind Eng2006322941
- TeunterRHFlapperSDPLot-sizing for a single-stage single-product production system with rework of perishable production defectivesOR Spec200325859610.1007/s00291-002-0105-3
- YuLShihHMPfundMCarlyleWMFowlerJWScheduling of unrelated parallel machines: An application to PWB manufacturingIIE Trans200234921931
- ZargarAMEffect of rework strategies on cycle timeComput Ind Eng19952923924310.1016/0360-8352(95)00078-F