References
- BaiDTangLWorst case analysis of a new lower bound for flow shop weighted completion time problemThe First International Conference on Combinatorial Optimization and Applications. Lecture Notes in Computer Science2007191199
- BramelJSimchi-LeviDThe Logic of Logistics: Theory, Algorithms, and Applications for Logistics Management1997
- ChenBGlassCAPottsCNStrusevichVAA new heuristic for three-machine flow shop schedulingOpns Res19964489189810.1287/opre.44.6.891
- GareyMRJohnsonDSSethiRThe complexity of flowshop and jobshop schedulingMath Opns Res1976111712910.1287/moor.1.2.117
- GlynnPWWhittWDepartures from many queues in seriesAnn Appl Probab1991154657210.1214/aoap/1177005838
- GonzalezTSahniSFlow shop and job shop schedules: Complexity and approximationOpns Res197826365210.1287/opre.26.1.36
- GrahamRLLawlerELLenstraJKRinnooy KanAHGOptimization and approximation in deterministic machine sequencing and scheduling: A surveyAnn Discrete Math1979528732610.1016/S0167-5060(08)70356-X
- HallLAApproximability of flow shop schedulingMath Program199882175190
- IgnallISchrageLApplication of the branch-and-bound technique to some flow-shop scheduling problemsOpns Res19651340041210.1287/opre.13.3.400
- JohnsonSMOptimal two- and three-stage production schedules with setup times includedNaval Res Log19541616810.1002/nav.3800010110
- LenstraJKRinnooy KanAHGBruckerPComplexity of machine scheduling problemsAnn Opns Res19771343362
- LiuHQueyranneMSimchi-LeviDOn the asymptotic optimality of algorithms for the flow shop problem with release datesNaval Res Log20055223224210.1002/nav.20066
- PottsCNAnalysis of heuristics for two-machine flow-shop sequencing subject to release datesMath Opns Res19851057658410.1287/moor.10.4.576
- RamudhinABartholdiJJCalvinJMVande VateJHWeissGA probabilistic analysis of two-machine flowshopsOpns Res19964489990810.1287/opre.44.6.899
- SgallJOn-line schedulingOnline Algorithms: The State of the Art. Lecture Notes in Computer Science1998196231
- WilliamsonDPHallLAHoogeveenJAHurkensCAJLenstraJKSevast'janovSVShmoysDBShort shop schedulesOpns Res19974528829410.1287/opre.45.2.288
- XiaCHShanthikumarJGGlynnPWOn the asymptotic optimality of the SPT rule for the flow shop average completion time problemOpns Res20004861562210.1287/opre.48.4.615.12423