References
- AlcarazJMarotoCRuizRSolving the multi-mode resource-constrained project scheduling problem with genetic algorithmsJ Opl Res Soc20035461462610.1057/palgrave.jors.2601563
- BattitiRBrunatoMMasciaFReactive search and intelligent optimizationOperations Research/Computer Science Interfaces2008
- BlazewiczJLenstraJKKanAHGRScheduling subject to resource constraints: Classification and complexityDiscrete Appl Math19835112410.1016/0166-218X(83)90012-4
- BouleimenKLecocqHA new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode versionEur J Opl Res200314926828110.1016/S0377-2217(02)00761-0
- BruckerPDrexlAMohringRNeumannKPeschEResource-constrained project scheduling: Notation, classification, models and methodsEur J Opl Res199911234110.1016/S0377-2217(98)00204-5
- DemeulemeesterEHerroelenWProject scheduling: A research handbookInternational Series in Operations Research & Management Science2002
- De ReyckBHerroelenWThe multi-mode resource-constrained project scheduling problem with generalized precedence relationsEur J Opl Res199911953855610.1016/S0377-2217(99)00151-4
- HartmannSProject scheduling with multiple modes: A genetic algorithmAnn Opns Res199710211113510.1023/A:1010902015091
- HerroelenWDe ReyckBDemeulemeesterEResource-constrained project scheduling: A survey of recent developementsComput Opns Res19982529730210.1016/S0305-0548(97)00055-5
- JarbouiBDamakNSiarryPRebaiAA combinatorial particle swarm optimization for solving multi-mode resource-constrained project scheduling problemsAppl Math Comput2008195299308
- JedrzejowiczPRatajczak-RopelEPopulation learning algorithm for the resource-constrained project schedulingInternational Series in Operations Research & Management Science2006275296
- Jedrzejowicz P and Ratajczak-Ropel E (2007). Agent-based approach to solving the resource constrained project scheduling problem. 4431/2007 (8th International Conference, ICANNGA 2007), Springer: Berlin/Heidelberg. pp 480–487.
- JozefowskaJMikaMRozyckiRWaligoraGWeglarzJSimulated annealing for multi-mode resource-constrained project schedulingAnn Opns Res200110213715510.1023/A:1010954031930
- KnottsGDrorMHartmanBCAgent-based project schedulingIIE T200032387401
- KolischRSerial and parallel resource-constrained project scheduling methods revisited: Theory and computationEur J Opl Res19969032033310.1016/0377-2217(95)00357-6
- KolischRHartmannSExperimental investigation of heuristics for resource-constrained project scheduling: An updateEur J Opl Res2006174233710.1016/j.ejor.2005.01.065
- KolischRSprecherAPSPLIB—A project scheduling problem libraryEur J Opl Res19969620521610.1016/S0377-2217(96)00170-1
- LiKYWillisRJAn iterative scheduling technique for resource-constrained project schedulingEur J Opl Res19925637037910.1016/0377-2217(92)90320-9
- LittmanMLMarkov games as a framework for multi-agent reinforcement learningProceedings of the Eleventh International Conference on Machine Learning1994157163
- LovaATormosPCervantesMBarberFAn efficient hybrid genetic algorithm for scheduling projects with resource constraints and multiple execution modesInt J Prod Econ200911730231610.1016/j.ijpe.2008.11.002
- MasaoMTsengCCA genetic algorithm for multi-mode resource constrained project scheduling problemEur J Opl Res199710013414110.1016/S0377-2217(96)00180-4
- NarendraKSThathacharMALearning Automata: An Introduction1989
- PattersonJTalbotFSlowinskiRWeglarzJComputational experience with a backtracking algorithm for solving a general class of precedence and resource-constrained scheduling problemsEur J Opl Res199049687910.1016/0377-2217(90)90121-Q
- PritskerAABWattersLJWolfePMMultiproject scheduling with limited resources: A zero-one programming approachMngt Sci1969169310710.1287/mnsc.16.1.93
- RanjbarMDe ReyckBKianfarFA hybrid scatter search for the discrete time/resource trade-off problem in project schedulingEur J Opl Res2009193354810.1016/j.ejor.2007.10.042
- SprecherAHartmannSDrexlAAn exact algorithm for project scheduling with multiple modesOR Spektrum19971919520310.1007/BF01545587
- SuttonRSBartoGReinforcement Learning1998
- TalbotFBResource constrained project scheduling with time-resource tradeoffs: The nonpreemptive caseMngt Sci1982281197121010.1287/mnsc.28.10.1197
- ThathacharMALSastryPSNetworks of Learning Automata Techniques for Online Stochastic Optimization2004
- ThomasPRSalhiSA tabu search approach for the resource constrained project scheduling problemJ Heuristics1998412313910.1023/A:1009673512884
- Van PeteghemVVanhouckeMAn articial immune system for the multi-mode resource-constrained project scheduling problem2009
- Van PeteghemVVanhouckeMA genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problemEur J Opl Res201020140941810.1016/j.ejor.2009.03.034
- VerbeeckKNowéAVrancxPPeetersMReinforcement learning theory and applicationsMulti-Automata Learning2008167185
- VrancxPVerbeeckKNowéADecentralized learning in Markov gamesIEEE T Syst Man Cybern20083897698110.1109/TSMCB.2008.920998
- Watkins CJCH (1989). Learning from delayed rewards. PhD Thesis, Cambridge University.
- WheelerRMNarendraKDecentralized learning in finite Markov chainsIEEE T Automat Contr1986AC-3151952610.1109/TAC.1986.1104342
- ZhuGBardJTuGA branch-and-cut procedure for the multimode resource-constrained project-scheduling problemJ Comput200618377390