References
- AhireSGreenwoodGGuptaATerwilligerMWorkforce-constrained preventive maintenance scheduling using evolution strategiesDecision Sci J20003183385910.1111/j.1540-5915.2000.tb00945.x
- AlardhiMLabibAWPreventive maintetance scheduling of multi-cogeneration plants using integer programmingJ Opl Res Soc20085950350910.1057/palgrave.jors.2602386
- BérubéJ-FGendreauMPotvinJ-YAn exact ε-constraint method for bi-objective combinatorial optimization problems: Application to the Traveling Salesman Problem with ProfitsEur J Opl Res2009194395010.1016/j.ejor.2007.12.014
- DijkstraMCKroonLGSalomonMVan NunenJVan WassenhoveLNPlanning the size and organization of KLM's aircraft maintenance personnelInterfaces1994246475810.1287/inte.24.6.47
- EhrgottMGandibleuxXMultiobjective combinatorial optimization–theory, methodology, and applicationsMultiple Criteria Optimization: State of the Art Annotated Bibliographic Surveys2002369444
- GopalakrishnanMAhireSLMillerDMMaximizing the effectiveness of a preventive maintenance system: An adaptive modelling approachMngt Sci19974382784010.1287/mnsc.43.6.827
- HigginsAScheduling of railway track maintenance activities and crewsJ Opl Res Soc1998491026103310.1057/palgrave.jors.2600612
- LINDO Systems Inc. (2008). Extended Lingo: Version 10.0+ Users Guide . LINDO Systems Inc.: Chicago, US.
- McCallJMaintenance policies for stochastically failing equipment: A surveyMngt Sci19651149352410.1287/mnsc.11.5.493
- MiettinenKMNonlinear multiobjective optimization1999
- MooreWJStarrAGAn intelligent maintenance system for continuous cost-based prioritization of maintenance activitiesComput Ind20065759560610.1016/j.compind.2006.02.008
- MosleySATeynerTUzsoyRMMaintenance scheduling and staffing policies in a wafer fabrication facilityIEEE T Semiconduct M19981131632310.1109/66.670182
- PrinsCProdhonCCalvoRWTwo-phase method and Lagrangian relaxation to solve the bi-objective set covering problemAnn Opns Res2006147234110.1007/s10479-006-0060-5
- PrzybylskiAGandibleuxXEhrgottMTwo phase algorithms for the bi-objective assignment problemEur J Opl Res200818550953310.1016/j.ejor.2006.12.054
- QuanGGreenwoodGWLiuDHuSSearching for multiobjective preventive maintenance schedules: Combining preferences with evolutionary algorithmsEur J Opl Res20071771969198410.1016/j.ejor.2005.12.015
- QuintanaaRLeungaMTVillalobosbJRGraulMCorrective maintenance through dynamic work allocation and pre-emption: Case study and applicationInt J Prod Res2009473539355710.1080/00207540701824225
- RobertsSMEscuderoLFScheduling of plant maintenance personnelJ Opt Theory and Appl19833932334310.1007/BF00934541
- SafaeiNBanjevicDJardineAKSMulti-objective simulated annealing for a maintenance workforce scheduling problem: A case studyGlobal optimization: Focus on Simulated Annealing20082748
- Tavakkoli-MoghaddamRSafaeiNSassaniFA memetic algorithm for the flexible flow line scheduling problem with processor blockingComput Opns Res20083640241410.1016/j.cor.2007.10.011
- VerginRCScheduling maintenance and determining crew size for stochastically failing equipmentMngt Sci196613526510.1287/mnsc.13.2.B52
- WagnerHMGiglioRJGlaserRGPreventive maintenance scheduling by mathematical programmingMngt Sci19641031633410.1287/mnsc.10.2.316
- WorrallBMMertBApplication of dynamic scheduling rules in maintenance planning and schedulingInt J Prod Res198018577110.1080/00207548008919649
- YangaT-HYanbSChenH-HAn airline maintenance manpower planning model with flexible strategiesJ Air Transport Mngt2003923323910.1016/S0969-6997(03)00013-9