References
- Adams D and Beckett D (1999). Programming in 4th Dimension, The Ultimate Guide. Automated solutions group: Huntington Beach, CA.
- DuttaGFourerRA survey of mathematical programming applications in an integrated steel plantManuf Serv Opns Mngt200134387400
- DuttaGFourerRAn optimization based decision support system for strategic and operational planning in process industriesOptim Eng20045329531410.1023/B:OPTE.0000038888.65465.4e
- DuttaGFourerRDatabase structure for a class of multi-period mathematical programming modelsDecis Support Syst20084587088310.1016/j.dss.2008.02.010
- DuttaGSinhaGPRoyPNMitterNA linear programming model for distribution of electrical energy in a steel plantInt Trans Opl Res199411172910.1016/0969-6016(94)90042-6
- DuttaGSinhaGPRoyPNA product mix optimizer for an integrated steel plantIIMB Management Review2000December8086
- DuttaGFourerRMajumdarADuttaDAn optimization-based decision support system for strategic planning in a process industry: The case of a pharmaceutical company in IndiaInt J Prod Econ20071029210310.1016/j.ijpe.2006.04.011
- FourerRDatabase structures for mathematical programming modelsDecis Support Syst19972031734410.1016/S0167-9236(97)00007-9
- GravelMPriceWLGagnéCScheduling jobs in an alcan aluminium foundry using a genetic algorithmInt J Prod Res2000383031304110.1080/00207540050117422
- Gupta N (2008). A stochastic optimization based decision support system for strategic planning in process industries. PhD Dissertation, IIM Ahmedabad, India.
- MarstenREThe design of the XMP linear programming libraryACM T Math Software1981748149710.1145/355972.355976
- NichollsMGOptimizing the operations of an ingot mill in an aluminium smelterJ Opl Res Soc19944598799810.1057/jors.1994.165
- NichollsMGAluminium production modelling—A nonlinear bilevel programming approachOpns Res19954320821810.1287/opre.43.2.208
- NichollsMGScheduling production in a heavily constrained plant—Anode manufacture in an aluminium smelterJ Opl Res Soc199546579591
- NichollsMGDeveloping an integrated model of an aluminium smelter incorporating sub-models with different time bases and levels of aggregationEur J Opl Res19979947949210.1016/S0377-2217(96)00335-9
- NichollsMGHedditchDJThe development of an integrated mathematical model of an aluminium smelterJ Opl Res Soc19934422523510.1057/jors.1993.47
- SinhaGPChandrashekaranBSMitterNDuttaGSinghSBRoyPNRoy ChoudharyAStrategic and operational management with optimization at Tata SteelInterfaces199522161910.1287/inte.25.1.6
- WarburtonAMarsiKUsing optimization to improve the yield of an aluminium extrusion plantJ Opl Res Soc1998491111111610.1057/palgrave.jors.2600616