113
Views
20
CrossRef citations to date
0
Altmetric
General Paper

A path-relinking metaheuristic for the resource levelling problem

Pages 1071-1078 | Received 01 Oct 2011, Accepted 01 Aug 2012, Published online: 21 Dec 2017

References

  • AhujaHNConstruction Performance Control by Networks1976
  • BallestinFSchwindtCZimmermannJResource leveling in make-to-order production: Modeling and heuristic solution methodInternational Journal of Operations Research2007415062
  • BandelloniMTucciMRinaldiROptimal resource leveling using non-serial dynamic programmingEuropean Journal of Operational Research199478216217710.1016/0377-2217(94)90380-8
  • BrinkmannKNeumannKHeuristic procedures for resource-constrained project scheduling with minimal and maximal time lags: The resource-levelling and minimum project-duration problemsJournal of Decision Systems199651–212915510.1080/12460125.1996.10511678
  • BurgessARKillebrewJBVariation of activity level on a cyclic arrow diagramJournal of Industrial Engineering19621327683
  • DemeulemeesterEMinimizing resource availability costs in time-limited project networksManagement Science199541101590159810.1287/mnsc.41.10.1590
  • DemeulemeesterEHerroelenWProject Scheduling—A Research Handbook2002
  • DemeulemeesterEVanhouckeMHerroelenWRanGen: A random network generator for activity-on-the-node networksJournal of Scheduling200361133410.1023/A:1022283403119
  • DrotosMKisTResource leveling in a machine environmentEuropean Journal of Operational Research20112121122110.1016/j.ejor.2011.01.043
  • EasaSMResource leveling in construction by optimizationJournal of Construction Engineering and Management1998115230231610.1061/(ASCE)0733-9364(1989)115:2(302)
  • GengJQWengLPLiuSHAn improved ant colony optimization algorithm for nonlinear resource-leveling problemsComputers and Mathematics with Applications20116182300230510.1016/j.camwa.2010.09.058
  • GloverFTabu search and adaptive memory programming—Advances, applications and challengesInterfaces in Computer Science and Operations Research1996175
  • HarrisRBPrecedence and Arrow Networks for Construction1978
  • HarrisRBPacking method for resource leveling (pack)Journal of Construction Engineering and Management1990116233135010.1061/(ASCE)0733-9364(1990)116:2(331)
  • HartmannSBriskornDA survey of variants and extensions of the resource-constrained project scheduling problemEuropean Journal of Operational Research2010207111410.1016/j.ejor.2009.11.005
  • LagunaMMartíRScatter Search: Methodology and Implementations in C2003
  • LeuSSYangCHHuangJCResource leveling in construction by genetic algorithm-based optimization and its decision support system applicationAutomated Construction2000101274110.1016/S0926-5805(99)00011-4
  • MeridithJRMantelSJProject Management: A Managerial Approach1995
  • ModerJJPhillipsCRDavisEWProject Management with CPM PERT and Project Diagramming1983
  • NeumannKZimmermannJResource leveling for projects with schedule-dependent time windowsEuropean Journal of Operational Research1999117359160510.1016/S0377-2217(98)00272-0
  • NeumannKZimmermannJProcedures for resource levelling and net present value problems in project scheduling with general temporal and resource constraintsEuropean Journal of Operational Research2000127242544310.1016/S0377-2217(99)00498-1
  • NeumannKSchwindtCZimmermannJProject Scheduling with Time Windows and Scarce Resources2003
  • RanjbarMDe ReyckBKianfarFA hybrid scatter search for the discrete time/resource trade-off problem in project schedulingEuropean Journal of Operational Research20091931354810.1016/j.ejor.2007.10.042
  • RocaJPugnaghiELibertGSolving an extended resource leveling problem with multiobjective evolutionary algorithmsInternational Journal of Information and Mathematical Sciences200844289300
  • SavinDAlkassSFazioPConstruction resource leveling using neural networksCanadian Journal of Civil Engineering199623491792510.1139/l96-898
  • SavinDAlkassSFazioPA procedure for calculating the weight-matrix of a neural network for resource levelingAdvanced Engineering Software199728527728310.1016/S0965-9978(97)00019-7
  • TakamotoMYamadaNKobayashiYNonakaHZero-one quadratic programming algorithm for resource leveling of manufacturing process schedulesSystems and Computers in Japan19952610687610.1002/scj.4690261007
  • TavaresLVOptimal resource profiles for program schedulingEuropean Journal of Operational Research1987291839010.1016/0377-2217(87)90196-2
  • YounisMASaadBOptimal resource leveling of multi-resource projectsComputers and Industrial Engineering1996311–21410.1016/0360-8352(96)00116-7

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.