Integrated methodology to design and manage work-in-process buffers in repetitive building projects

, &
Pages 1182-1193 | Received 01 Mar 2012, Accepted 01 Nov 2012, Published online: 21 Dec 2017

References

  • AbouRizkSMHalpinDWWilsonJRVisual interactive fitting of beta distributionsJournal of Construction Engineering Management, ASCE1991117458960510.1061/(ASCE)0733-9364(1991)117:4(589)
  • Alarcón LF and Ashley DB (1999). Playing games: Evaluating the impact of lean production strategies on project cost and schedule. In: Proceedings of IGLC-7, University of Berkeley, California, USA, 26–28 July.
  • Ballard G (2000). The last planner system of production control. PhD's Thesis, School of Civil Engineering, Faculty of Engineering, The University of Birmingham, Birmingham, UK.
  • BallardGHowellGShielding production: Essential step in production controlJournal of Construction Engineering and Management, ASCE19981241111710.1061/(ASCE)0733-9364(1998)124:1(11)
  • BashfordHHWalshKDSawhneyAProduction system loading—Cycle time relationship in residential constructionJournal of Construction Engineering and Management, ASCE20051311152210.1061/(ASCE)0733-9364(2005)131:1(15)
  • Buchholz P and Thümmler A (2005). Enhancing evolutionary algorithms with statistical selection procedures for simulation optimization. In: Proceedings of Winter Simulation Conference, Orlando, Florida, USA, 4–7 December.
  • Carson Y and Maria A (1997). Simulation optimization: Methods and applications. In: Proceedings of Winter Simulation Conference, Atlanta, Georgia, USA, 7–10 December.
  • CohenIMandelbaunAShtubAMulti-project scheduling and control: A process-based comparative study of the critical chain methodology and some alternativesProject Management Journal20043523950
  • DemingWEOut of the Crisis1986
  • FengCLiuLBurnsSUsing genetic algorithms to solve construction time-cost trade-off problemsJournal of Computing in Civil Engineering, ASCE199711318418910.1061/(ASCE)0887-3801(1997)11:3(184)
  • GoldrattEMCritical Chain1997
  • González V and Alarcón LF (2009). A methodology for integrated buffer design and management in repetitive construction projects. In: 17th International Conference for Lean Construction, Taipei, Taiwan, 15–17 July.
  • GonzálezVAlarcónLFUncertainty Management in Repetitive Projects Using Work-In-Process Buffers2010
  • GonzálezVAlarcónLFMolenaarKMultiobjective design of work-in-process buffer for scheduling repetitive building projectsAutomation in Construction20091829510810.1016/j.autcon.2008.05.005
  • GonzálezVAlarcónLFMaturanaSMundacaFBustamanteJImproving planning reliability and project performance using the reliable commitment modelJournal of Construction Engineering and Management, ASCE2010136101129113910.1061/(ASCE)CO.1943-7862.0000215
  • GonzálezVAlarcónLFMaturanaSBustamanteJAMundacaFSite management of work-in-process buffers to enhance project performance using the reliable commitment model: Case studyJournal of Construction Engineering and Management, ASCE2011137970771510.1061/(ASCE)CO.1943-7862.0000346
  • HoppWJSpearmanMLFactory Physics: Foundations of Manufacturing Management2000
  • JodlbauerHHuberAService-level performance of MRP, kanban, CONWIP and DBR due to parameter stability and environmental robustnessInternational Journal of Production Research20084682179219510.1080/00207540600609297
  • LauferATuckerRLShapiraAShenharAJThe multiplicity concept in construction project planningConstruction Management and Economics1994121536510.1080/01446199400000007
  • LawAMKeltonWDSimulation Modelling and Analysis2000
  • McGrayGEPurvisRLMcCrayCGProject management under uncertainty: The impact of heuristics and biasesProject Management Journal20023314957
  • ParkMPeña-MoraFReliability buffering for construction projectsJournal of Construction Engineering and Management, ASCE2004130562663710.1061/(ASCE)0733-9364(2004)130:5(626)
  • ThomasHRHormanMJLemes de SouzaUEZavrskiIReducing variability to improve performance as a lean construction principleJournal of Construction Engineering and Management, ASCE2002128214415410.1061/(ASCE)0733-9364(2002)128:2(144)
  • TommeleinIDRileyDRHowellGAParade game: Impact of work flow variability on trade performanceJournal of Construction Engineering and Management, ASCE1999125530431010.1061/(ASCE)0733-9364(1999)125:5(304)
  • WalshKDSawhneyABashfordHHProduction equations for unsteady-state construction processesJournal of Construction Engineering and Management, ASCE2007133325426110.1061/(ASCE)0733-9364(2007)133:3(254)
  • WomackJPJonesDTLean Thinking: Banish Waste and Create Wealth in Your Corporation1996

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.