Sustainable workforce scheduling in construction program management

, &
Pages 1169-1181 | Received 01 Apr 2012, Accepted 01 Nov 2012, Published online: 21 Dec 2017

References

  • AdrianJJConstruction Productivity Improvement1987
  • AlvesMJClímacoJA review of interactive methods for multiobjective integer and mixed-integer programmingEuropean Journal of Operational Research200718019911510.1016/j.ejor.2006.02.033
  • AlwaerHClements-CroomeDJKey performance indicators (KPIs) and priority setting using the multi-attribute approach for assessing sustainable intelligent buildingsBuilding and Environment201045479980710.1016/j.buildenv.2009.08.019
  • BeloutAEffects of human resource management on project effectiveness and success: Toward a new conceptual frameworkInternational Journal of Project Management1998161212610.1016/S0263-7863(97)00011-2
  • BurlesonRCHaasCTTuckerRLStanleyAMultiskilled labor utilization strategies in constructionJournal of Construction Engineering and Management1998124648048910.1061/(ASCE)0733-9364(1998)124:6(480)
  • ChankongVHaimesYYMultiobjective Decision Making: Theory and Methodology1983
  • El-RayesKMoselhiOOptimizing resource utilization for repetitive construction projectsJournal of Construction Engineering and Management20011271182710.1061/(ASCE)0733-9364(2001)127:1(18)
  • Fernandez-SanchezGRodriguez-LopezFA methodology to identify sustainability indicators in construction project management—Application to infrastructure projects in SpainEcological Indicators20101061193120110.1016/j.ecolind.2010.04.009
  • GomarJEHaasCTMortonDPAssignment and allocation optimization of partially multiskilled workforceJournal of Construction Engineering and Management2002128210310910.1061/(ASCE)0733-9364(2002)128:2(103)
  • HartmannSProject scheduling with multiple modes: A genetic algorithmAnnals of Operations Research20011021–411113510.1023/A:1010902015091
  • HartmannSBriskornDA survey of variants and extensions of the resource-constrained project scheduling problemEuropean Journal of Operational Research2010207111410.1016/j.ejor.2009.11.005
  • HyariKEl-MashalehMKandilAOptimal assignment of multiskilled labor in building construction projectsInternational Journal of Construction Education and Research201061708010.1080/15578771003590284
  • JaskowskiPSobotkaAScheduling construction projects using evolutionary algorithmJournal of Construction Engineering and Management2006132886187010.1061/(ASCE)0733-9364(2006)132:8(861)
  • JunHJEl-RayesKOptimizing the utilization of multiple labor shifts in construction projectsAutomation in Construction201019210911910.1016/j.autcon.2009.12.015
  • LabuschagneCBrentACVan ErckRPGAssessing the sustainability performances of industriesJournal of Cleaner Production200513137338510.1016/j.jclepro.2003.10.007
  • LiRKYWillisRJResource constrained scheduling within fixed project durationsJournal of the Operational Research Society1993441718010.1057/jors.1993.8
  • Lill I (2008). Sustainable management of construction labour. In: Zavadskas EK, Kaklauskas A and Skibniewski MJ (eds). Proceedings of the 25th International Symposium on Automation and Robotics in Construction ISARC-2008, Vilnius Lithuania, Vilnius: Technika, pp 864–875.
  • LingardHSubletAThe impact of job and organisational demands on marital or relationship satisfaction and conflict among Australian civil engineersConstruction Management and Economics200220650752110.1080/01446190210156073
  • LoosemoreMDaintyALingardHHuman Resource Management in Construction Projects: Strategies and Operational Approaches2003
  • MacKenzieSKilpatrickARAkintoyeAUK construction skills shortage response strategies and an analysis of industry perceptionsConstruction Management and Economics201018785386210.1080/014461900433131
  • MedagliaALHuethDMendietaJCSefairJAA multiobjective model for the selection and timing of public enterprise projectsSocio-Economic Planning Sciences2008421314510.1016/j.seps.2006.06.009
  • Palacio JD (2010). On the multi-mode resource-constrained project scheduling problem with minimum and maximum time lags (MRCPSP/max) via mixed-integer programming. MSc Thesis (in Spanish), Universidad de los Andes.
  • PinedoMLPlanning and Scheduling in Manufacturing and Services2005
  • RamosTBCaeiroSMeta-performance evaluation of sustainability indicatorsEcological Indicators201010215716610.1016/j.ecolind.2009.04.008
  • ReissGProgramme Management Demystified: Managing Multiple Projects Successfully1996
  • RSMeans (2012). RSMeans reed construction data. http://rsmeans.reedconstructiondata.com/, accessed on 23 March 2012.
  • SefairJAMolanoAMedagliaALSarmientoOLLocating neighborhood parks with a lexicographic multi-objective optimization methodCommunity-Based Operations Research: Decision Modeling for Local Impact and Diverse Populations201116714317110.1007/978-1-4614-0806-2_6
  • SinghRKMurtyHRGuptaSKDikshitAKDevelopment of composite sustainability performance index for steel industryEcological Indicators20077256558810.1016/j.ecolind.2006.06.004
  • SinghRKMurtyHRGuptaSKDikshitAKAn overview of sustainability assessment methodologiesEcological Indicators20099218921210.1016/j.ecolind.2008.05.011
  • SprecherADrexlAMulti-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithmEuropean Journal of Operational Research1998107243145010.1016/S0377-2217(97)00348-2
  • SrourIMHaasCTMortonDPLinear programming approach to optimize strategic investment in the construction workforceJournal of Construction Engineering and Management2006132111158116610.1061/(ASCE)0733-9364(2006)132:11(1158)
  • SteuerRMultiple Criteria Optimization: Theory, Computation and Application1989
  • TahirACDartonRCThe process analysis method of selecting indicators to quantify the sustainability performance of a business operationJournal of Cleaner Production20101816–171598160710.1016/j.jclepro.2010.07.012
  • UgwuOOHauptTCKey performance indicators for infrastructure sustainability—A comparative study between Hong Kong and South AfricaJournal of Engineering, Design and Technology200531304310.1108/17260530510815321
  • VillegasJGPalaciosFMedagliaALSolution methods for the bi-objective (cost-coverage) unconstrained facility location problem with an illustrative exampleAnnals of Operations Research2006147110914110.1007/s10479-006-0061-4
  • WongwaiNMalaikrisanachaleeSAugmented heuristic algorithm for multi-skilled resource schedulingAutomation in Construction201120442944510.1016/j.autcon.2010.11.012
  • ZhangHTamCMLiHMultimode project scheduling based on particle swarm optimizationComputer-Aided Civil and Infrastructure Engineering20062129310310.1111/j.1467-8667.2005.00420.x
  • ZhuGBardJFYuGDisruption management for resource-constrained project schedulingJournal of the Operational Research Society200556436538110.1057/palgrave.jors.2601860

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.