An optimization-based model for maximizing the benefits of fast-track construction activities

, &
Pages 1137-1146 | Received 01 Mar 2012, Accepted 01 Jan 2013, Published online: 21 Dec 2017

References

  • AbdelsalamHMEBaoHPA simulation-based optimization framework for product development cycle time reductionIEEE Transactions on Engineering Management2006531698510.1109/TEM.2005.861805
  • AustinSBaldwinALiBWaskettPAnalytical design planning technique (ADePT): A dependency structure matrix tool to schedule the building design processConstruction Management and Economics200018217318210.1080/014461900370807
  • BlacudNBogusSDiekmannJMolenaarKSensitivity of construction activities under design uncertaintyJournal of Construction Engineering and Management2009135319920610.1061/(ASCE)0733-9364(2009)135:3(199)
  • BogusSMolenaarKRDiekmannJEStrategies for overlapping dependent design activitiesConstruction Management and Economics200624882983710.1080/01446190600658529
  • BogusSDiekmannJMolenaarKHarperCPatilSLeeJSimulation of overlapping design activities in concurrent engineeringJournal of Construction Engineering and Management20111371195095710.1061/(ASCE)CO.1943-7862.0000363
  • BrowningTREppingerSDModeling impacts of process architecture on cost and schedule risk in product developmentIEEE Transactions on Engineering Management200249442844210.1109/TEM.2002.806709
  • ChuaDKHHossainMAA simulation model to study the impact of early information on design duration and redesignInternational Journal of Project Management201129324625710.1016/j.ijproman.2010.02.012
  • CooperKGThe rework cycle: Benchmarks for the project managerInternational Journal of Project Management19932411722
  • DehghanRRuwanpuraJYThe mechanism of design activity overlapping in construction projects and the time-cost tradeoff functionProcedia Engineering2011141959196510.1016/j.proeng.2011.07.246
  • FordDNStermanJDOvercoming the 90% syndrome: iteration management in concurrent development projectsConcurrent Engineering200311317718610.1177/106329303038031
  • GrayCFlanaganRUS productivity and fast tracking starts on the drawing boardConstruction Management and Economics19842213314410.1080/01446198400000013
  • HartmannTVan MeerveldHVossebeldNAdriaanseAAligning building information model tools and construction management methodsAutomation in Construction20122260561310.1016/j.autcon.2011.12.011
  • HossainMAChuaDKHLiuZOptimizing concurrent execution of design activities with minimum redesignJournal of Computing in Engineering2012263409420
  • HwangBGThomasSRHaasCTCaldasCHMeasuring the impact of rework on construction cost performanceJournal of Construction Engineering and Management2009135318719810.1061/(ASCE)0733-9364(2009)135:3(187)
  • JeongYSEastmanCMSacksRKanerIBenchmark tests for BIM data exchanges of precast concreteAutomation in Construction200918446948410.1016/j.autcon.2008.11.001
  • KrishnanVEppingerSDWhitneyDEA model-based framework to overlap product development activitiesManagement Science199743443745110.1287/mnsc.43.4.437
  • LeeSPeña-MoraFParkMReliability and stability buffering approach: Focusing on the issues of errors and changes in concurrent design and construction projectsJournal of Construction Engineering and Management2006132545246410.1061/(ASCE)0733-9364(2006)132:5(452)
  • LinJChaiKHWongYSBrombacherACA dynamic model for managing overlapped iterative product developmentEuropean Journal of Operational Research2008185137839210.1016/j.ejor.2006.12.022
  • LinJChaiKHBrombacherACWongYSOptimal overlapping and functional interaction in product developmentEuropean Journal of Operational Research200919631158116910.1016/j.ejor.2008.05.030
  • LochCHTerwieschCCommunication and uncertainty in concurrent engineeringManagement Science19984481032104810.1287/mnsc.44.8.1032
  • LovePEDLiHQuantifying the causes and costs of rework in constructionConstruction Management and Economics200018447949010.1080/01446190050024897
  • LovePEDHoltGDShenLYLiHIraniZUsing systems dynamics to better understand change and rework in construction project management systemsInternational Journal of Project Management200220642543610.1016/S0263-7863(01)00039-4
  • LovePEDIraniZEdwardsDJA rework reduction model for construction projectsIEEE Transactions Engineering Management200451442644010.1109/TEM.2004.835092
  • LovePEDEdwardsDJSmithJWalkerDHTDivergence or congruence? A path model of rework for building and civil engineering projectsJournal of Performance Construction Facilities200923648048810.1061/(ASCE)CF.1943-5509.0000054
  • LovePEDEdwardsDJWatsonHDavisPRework in civil infrastructure projects: Determination of cost predictorsJournal of Construction Engineering and Management2010136327528210.1061/(ASCE)CO.1943-7862.0000136
  • LyneisJMFordDNSystem dynamics applied to project management: A survey, assessment, and directions for future researchSystem Dynamics Review2007232–315718910.1002/sdr.377
  • Peña-MoraFLiMDynamic planning and control methodology for design/build fast-track construction projectsJournal of Construction Engineering and Management2001127111710.1061/(ASCE)0733-9364(2001)127:1(1)
  • SrourIMAbdul-MalakMAUYassineAARamadanMA methodology for scheduling overlapped design activities based on dependency informationAutomation in Construction20132911110.1016/j.autcon.2012.08.001
  • TaylorTFordDManaging tipping point dynamics in complex construction projectsJournal of Construction Engineering and Management2008134642143110.1061/(ASCE)0733-9364(2008)134:6(421)
  • WearneSHFast-track project durationInternational Journal of Project Management19842424024110.1016/0263-7863(84)90042-5
  • WilliamsTEdenCAckermannFTaitAVicious circles of parallelismInternational Journal of Project Management199513315115510.1016/0263-7863(95)00034-N
  • YassineAInvestigating product development process reliability and robustness using simulationJournal of Engineering Design200718654556110.1080/09544820601011690
  • ZhaoZYLei LvQZuoJZillanteGPrediction system for change management in construction projectJournal of Construction Engineering and Management2010136665966910.1061/(ASCE)CO.1943-7862.0000168

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.