166
Views
18
CrossRef citations to date
0
Altmetric
Special Issue Paper

Dynamic priority rule-based forward-backward heuristic algorithm for resource levelling problem in construction project

&
Pages 1106-1117 | Received 01 Mar 2012, Accepted 01 Feb 2013, Published online: 21 Dec 2017

References

  • AnagnostopoulosKPKoulinasGKA simulated annealing hyperheuristic for construction resource levellingConstruction Management & Economics201028216317510.1080/01446190903369907
  • BandelloniMTucciMRinaldiROptimal resource leveling using non-serial dynamic programmingEuropean Journal of Operational Research199478216217710.1016/0377-2217(94)90380-8
  • ChristodoulouSEllinasGAslaniPEntropy-based scheduling of resource-constrained construction projectsAutomation in Construction200918791992810.1016/j.autcon.2009.04.007
  • ChristodoulouSEEllinasGMichaelidou-KamenouAMinimum moment method for resource leveling using entropy maximizationJournal of Construction Engineering and Management—ASCE2010136551852710.1061/(ASCE)CO.1943-7862.0000149
  • DemeulemeesterEMinimizing resource availability costs in time-limited project networksManagement Science19954110910.1287/mnsc.41.10.1590
  • EasaSMResource leveling in construction by optimizationJournal of Construction Engineering and Management—ASCE1989115230231610.1061/(ASCE)0733-9364(1989)115:2(302)
  • HarrisRBPacking method for resource leveling (Pack)Journal of Construction Engineering and Management—ASCE1990116233135010.1061/(ASCE)0733-9364(1990)116:2(331)
  • HerroelenWProject scheduling—Theory and practiceProduction & Operations Management200514441343210.1111/j.1937-5956.2005.tb00230.x
  • HiyassatMModification of minimum moment approach in resource levelingJournal of Construction Engineering and Management—ASCE2000126427828410.1061/(ASCE)0733-9364(2000)126:4(278)
  • HiyassatMApplying modified minimum moment method to multiple resource levelingJournal of Construction Engineering and Management—ASCE2001127319219810.1061/(ASCE)0733-9364(2001)127:3(192)
  • Hossein Hashemi DoulabiSSeifiAShariatSYEfficient hybrid genetic algorithm for resource leveling via activity splittingJournal of Construction Engineering and Management—ASCE2011137213714610.1061/(ASCE)CO.1943-7862.0000261
  • HuilingWMinLChengWApplication of heuristic algorithm in network-planning multiple resources balancingComputer Engineering and Application20034014226228
  • HuiminLXunDA mixed integer programming method for resource optimization in project constructionJournal of Southeast University (Natural Science Edition)1991374123129
  • KastorASirakoulisKThe effectiveness of resource levelling tools for resource constraint project scheduling problemInternational Journal of Project Management200927549350010.1016/j.ijproman.2008.08.006
  • KleinRBidirectional planning: Improving priority rule-based heuristics for scheduling resource-constrained projectsEuropean Journal of Operational Research2000127361963810.1016/S0377-2217(99)00347-1
  • KolischREfficient priority rules for the resource-constrained project scheduling problemJournal of Operations Management199614317919210.1016/0272-6963(95)00032-1
  • KolischRSerial and parallel resource-constrained project scheduling methods revisited: Theory and computationEuropean Journal of Operational Research199690232033310.1016/0377-2217(95)00357-6
  • KolischRResource allocation capabilities of commercial project management software packagesInterfaces1999294193110.1287/inte.29.4.19
  • LeachmanRCMultiple resource leveling in construction systems through variation of activity intensitiesNaval Research Logistics Quarterly198330218719810.1002/nav.3800300202
  • LeuS-SYangC-HHuangJ-CResource leveling in construction by genetic algorithm-based optimization and its decision support system applicationAutomation in Construction2000101274110.1016/S0926-5805(99)00011-4
  • LovaAMarotoCTormosPA multicriteria heuristic method to improve resource allocation in multiproject schedulingEuropean Journal of Operational Research2000127240842410.1016/S0377-2217(99)00490-7
  • NeumannKZimmermannJResource levelling for projects with schedule-dependent time windowsEuropean Journal of Operational Research1999117359160510.1016/S0377-2217(98)00272-0
  • NeumannKZimmermannJProcedures for resource leveling and net present value problems in project scheduling with general temporal and resource constraintsEuropean Journal of Operational Research2000127242544310.1016/S0377-2217(99)00498-1
  • SavinDAlkassSFazioPConstruction resource leveling using neural networksCanadian Journal of Civil Engineering199623491792510.1139/l96-898
  • SeibertJEEvansGWTime-constrained resource levelingJournal of Construction Engineering and Management—ASCE1991117350352010.1061/(ASCE)0733-9364(1991)117:3(503)
  • SprecherAKolischRDrexlASemi-active, active, and non-delay schedules for the resource-constrained project scheduling problemEuropean Journal of Operational Research19958019410210.1016/0377-2217(93)E0294-8
  • TormosPLovaATools for resource-constrained project scheduling and control: Forward and backward slack analysisJournal of the Operational Research Society200152777978810.1057/palgrave.jors.2601145
  • YinPWangJOptimal multiple-objective resource allocation using hybrid particle swarm optimization and adaptive resource bounds techniqueJournal of Computational and Applied Mathematics20082161738610.1016/j.cam.2007.04.018
  • YounisMASaadBOptimal resource leveling of multi-resource projectsComputers & Industrial Engineering1996311–21410.1016/0360-8352(96)00116-7

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.