References
- AnagnostopoulosKPKoulinasGKA simulated annealing hyperheuristic for construction resource levellingConstruction Management & Economics201028216317510.1080/01446190903369907
- BandelloniMTucciMRinaldiROptimal resource leveling using non-serial dynamic programmingEuropean Journal of Operational Research199478216217710.1016/0377-2217(94)90380-8
- ChristodoulouSEllinasGAslaniPEntropy-based scheduling of resource-constrained construction projectsAutomation in Construction200918791992810.1016/j.autcon.2009.04.007
- ChristodoulouSEEllinasGMichaelidou-KamenouAMinimum moment method for resource leveling using entropy maximizationJournal of Construction Engineering and Management—ASCE2010136551852710.1061/(ASCE)CO.1943-7862.0000149
- DemeulemeesterEMinimizing resource availability costs in time-limited project networksManagement Science19954110910.1287/mnsc.41.10.1590
- EasaSMResource leveling in construction by optimizationJournal of Construction Engineering and Management—ASCE1989115230231610.1061/(ASCE)0733-9364(1989)115:2(302)
- HarrisRBPacking method for resource leveling (Pack)Journal of Construction Engineering and Management—ASCE1990116233135010.1061/(ASCE)0733-9364(1990)116:2(331)
- HerroelenWProject scheduling—Theory and practiceProduction & Operations Management200514441343210.1111/j.1937-5956.2005.tb00230.x
- HiyassatMModification of minimum moment approach in resource levelingJournal of Construction Engineering and Management—ASCE2000126427828410.1061/(ASCE)0733-9364(2000)126:4(278)
- HiyassatMApplying modified minimum moment method to multiple resource levelingJournal of Construction Engineering and Management—ASCE2001127319219810.1061/(ASCE)0733-9364(2001)127:3(192)
- Hossein Hashemi DoulabiSSeifiAShariatSYEfficient hybrid genetic algorithm for resource leveling via activity splittingJournal of Construction Engineering and Management—ASCE2011137213714610.1061/(ASCE)CO.1943-7862.0000261
- HuilingWMinLChengWApplication of heuristic algorithm in network-planning multiple resources balancingComputer Engineering and Application20034014226228
- HuiminLXunDA mixed integer programming method for resource optimization in project constructionJournal of Southeast University (Natural Science Edition)1991374123129
- KastorASirakoulisKThe effectiveness of resource levelling tools for resource constraint project scheduling problemInternational Journal of Project Management200927549350010.1016/j.ijproman.2008.08.006
- KleinRBidirectional planning: Improving priority rule-based heuristics for scheduling resource-constrained projectsEuropean Journal of Operational Research2000127361963810.1016/S0377-2217(99)00347-1
- KolischREfficient priority rules for the resource-constrained project scheduling problemJournal of Operations Management199614317919210.1016/0272-6963(95)00032-1
- KolischRSerial and parallel resource-constrained project scheduling methods revisited: Theory and computationEuropean Journal of Operational Research199690232033310.1016/0377-2217(95)00357-6
- KolischRResource allocation capabilities of commercial project management software packagesInterfaces1999294193110.1287/inte.29.4.19
- LeachmanRCMultiple resource leveling in construction systems through variation of activity intensitiesNaval Research Logistics Quarterly198330218719810.1002/nav.3800300202
- LeuS-SYangC-HHuangJ-CResource leveling in construction by genetic algorithm-based optimization and its decision support system applicationAutomation in Construction2000101274110.1016/S0926-5805(99)00011-4
- LovaAMarotoCTormosPA multicriteria heuristic method to improve resource allocation in multiproject schedulingEuropean Journal of Operational Research2000127240842410.1016/S0377-2217(99)00490-7
- NeumannKZimmermannJResource levelling for projects with schedule-dependent time windowsEuropean Journal of Operational Research1999117359160510.1016/S0377-2217(98)00272-0
- NeumannKZimmermannJProcedures for resource leveling and net present value problems in project scheduling with general temporal and resource constraintsEuropean Journal of Operational Research2000127242544310.1016/S0377-2217(99)00498-1
- SavinDAlkassSFazioPConstruction resource leveling using neural networksCanadian Journal of Civil Engineering199623491792510.1139/l96-898
- SeibertJEEvansGWTime-constrained resource levelingJournal of Construction Engineering and Management—ASCE1991117350352010.1061/(ASCE)0733-9364(1991)117:3(503)
- SprecherAKolischRDrexlASemi-active, active, and non-delay schedules for the resource-constrained project scheduling problemEuropean Journal of Operational Research19958019410210.1016/0377-2217(93)E0294-8
- TormosPLovaATools for resource-constrained project scheduling and control: Forward and backward slack analysisJournal of the Operational Research Society200152777978810.1057/palgrave.jors.2601145
- YinPWangJOptimal multiple-objective resource allocation using hybrid particle swarm optimization and adaptive resource bounds techniqueJournal of Computational and Applied Mathematics20082161738610.1016/j.cam.2007.04.018
- YounisMASaadBOptimal resource leveling of multi-resource projectsComputers & Industrial Engineering1996311–21410.1016/0360-8352(96)00116-7