References
- AlcarazJMarotoCRuizRSolving the multi-mode resource-constrained project scheduling problem with genetic algorithmsJournal of the Operational Research Society200354661462610.1057/palgrave.jors.2601563
- BalasEProject Scheduling with Resource Constraints1968
- BellCEParkKSolving resource-constrained project scheduling problems by A* searchNaval Research Logistics (NRL)1990371618410.1002/1520-6750(199002)37:1<61::AID-NAV3220370104>3.0.CO;2-S
- BermanEResource allocation in a PERT network under continuous activity time-cost functionsManagement Science196410473474510.1287/mnsc.10.4.734
- BowmanEThe schedule-sequencing problemOperations Research19597562162410.1287/opre.7.5.621
- CarruthersJBattersbyAAdvances in critical path methodsJournal of the Operational Research Society196617435938010.1057/jors.1966.72
- ChristofidesNAlvarez-ValdesRTamaritJProject scheduling with resource constraints: A branch and bound approachEuropean Journal of Operational Research198729326227310.1016/0377-2217(87)90240-2
- DavisEHeidornGAn algorithm for optimal project scheduling under multiple resource constraintsManagement Science1971171280381610.1287/mnsc.17.12.B803
- DePDunneEGhoshJWellsCComplexity of the discrete time-cost tradeoff problem for project networksOperations Research199745230230610.1287/opre.45.2.302
- De ReyckBDemeulemeesterEHerroelenWLocal search methods for the discrete time/resource trade-off problem in project networksNaval Research Logistics199845655357810.1002/(SICI)1520-6750(199809)45:6<553::AID-NAV2>3.0.CO;2-1
- DecrkoRHebertJResource constrained project crashingOmega International Journal of Management Science1989171697910.1016/0305-0483(89)90022-4
- DeckroRFHebertJEModeling diminishing returns in project resource planningComputers and Industrial Engineering2003441193310.1016/S0360-8352(02)00182-1
- DemeulemeesterEDodinBHerroelenWA random activity network generatorOperations Research199341597298010.1287/opre.41.5.972
- DemeulemeesterEDe ReyckBHerroelenWThe discrete time/resource trade-off problem in project networks: A branch-and-bound approachIIE Transactions2000321110591069
- DemeulemeesterEHerroelenWA branch-and-bound procedure for the multiple resource-constrained project scheduling problemManagement Science199238121803181810.1287/mnsc.38.12.1803
- ElloumiSFortempsPA hybrid rank-based evolutionary algorithm applied to multi-mode resource-constrained project scheduling problemEuropean Journal of Operational Research20102051314110.1016/j.ejor.2009.12.014
- ElmaghrabySActivity Networks1977
- ElmaghrabySResource allocation via dynamic programming in activity networksEuropean Journal of Operational Research199364219921510.1016/0377-2217(93)90177-O
- GareyMRGrahamRLJohnsonDSYaoACCResource constrained scheduling as generalized bin packingJournal of Combinatorial Theory, Series A197621325729810.1016/0097-3165(76)90001-7
- HarveyRPattersonJAn implicit enumeration algorithm for the time/cost tradeoff problem in project network analysisFoundations of Control Engineering197942107117
- HastingsNOn resource allocation in project networksOperational Research Quarterly197223221722110.1057/jors.1972.32
- JózefowskaJMikaMRóżyckiRWaligóraGWęglarzJSimulated annealing for multi-mode resource-constrained project schedulingAnnals of Operations Research2001102113715510.1023/A:1010954031930
- Kelley J and Walker M (1959). Critical path planning and scheduling. In: 1959 Proceeding of the Eastern Joint Computing Conference 16, ACM, NewYork, pp.160–172.
- LovaATormosPCervantesMBarberFAn efficient hybrid genetic algorithm for scheduling projects with resource constraints and multiple execution modesInternational Journal of Production Economics2009117230231610.1016/j.ijpe.2008.11.002
- MingozziAManiezzoVRicciardelliSBiancoLAn exact algorithm for the resource-constrained project scheduling problem based on a new mathematical formulationManagement Science199844571472910.1287/mnsc.44.5.714
- NudtasomboomNRandhawaSResource-constrained project scheduling with renewable and non-renewable resources and time-resource tradeoffsComputers and Industrial Engineering199632122724210.1016/S0360-8352(96)00212-4
- PanagiotakopoulosDA CPM time-cost computational algorithm for arbitrary activity cost functionsINFOR1977152183195
- PattersonJHuberWA horizon-varying, zero-one approach to project schedulingManagement Science197420699010.1287/mnsc.20.6.990
- PritskerAWattersLWolfePMultiproject scheduling with limited resources: A zero-one programming approachManagement Science19691619310.1287/mnsc.16.1.93
- RadermacherFScheduling of project networksAnnals of Operations Research19854122725210.1007/BF02022042
- RanjbarMDe ReyckBKianfarFA hybrid scatter search for the discrete time/resource trade-off problem in project schedulingEuropean Journal of Operational Research20071931354810.1016/j.ejor.2007.10.042
- RanjbarMKianfarFSolving the discrete time/resource trade-off problem in project scheduling with genetic algorithmsApplied Mathematics and Computation2007191245145610.1016/j.amc.2007.02.109
- Seyed-HosseiniSSabzehparvarMA mathematical model for the continuous time/resource trade-off problemKuwait Journal of Science and Engineering2008351197215
- StinsonJDavisEKhumawalaBMultiple resource-constrained scheduling using branch and boundIIE Transactions1978103252259
- TalbotFBResource-constrained project scheduling with time-resource tradeoffs: The non-preemptive caseManagement Science198228101197121010.1287/mnsc.28.10.1197
- TalbotFBPattersonJHAn efficient integer programming algorithm with network cuts for solving resource-constrained scheduling problemsManagement Science197824111163117410.1287/mnsc.24.11.1163
- TsengLYChenSCTwo-phase genetic local search algorithm for the multimode resource-constrained project scheduling problemEvolutionary Computation, IEEE Transactions on200913484885710.1109/TEVC.2008.2011991
- Van PeteghemVVanhouckeMAn artificial immune system for the multi-mode resource-constrained project scheduling problemProceedings of the 9th European Conference on Evolutionary Computation in Combinatorial Optimization20098596
- Van PeteghemVVanhouckeMA genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problemEuropean Journal of Operational Research2010201240941810.1016/j.ejor.2009.03.034
- WęglarzJProject scheduling with continuously divisible, doubly constrained resourcesManagement Science19812791040105310.1287/mnsc.27.9.1040