Two-machine flow shop scheduling with deteriorating jobs: minimizing the weighted sum of makespan and total completion time

, , &
Pages 709-719 | Received 08 Jan 2014, Accepted 17 Apr 2014, Published online: 21 Dec 2017

References

  • AllahverdiAThe two- and m-machine flowshop scheduling problems with bicriteria of makespan and mean flowtimeEuropean Journal of Operational Research2003147237339610.1016/S0377-2217(02)00253-9
  • BozorgiradMALogendranRBi-criteria group scheduling in hybrid flowshopsInternational Journal of Production Economics2013145259961210.1016/j.ijpe.2013.05.015
  • ChengMBSunSJHeLMFlow shop scheduling problem with deteriorating jobs on no-idle dominant machinesEuropean Journal of Operational Research2007183111512410.1016/j.ejor.2006.10.043
  • ChengMBTadikamallaPRShangJZhangSQBicriteria hierarchical optimization of two-machine flow shop scheduling problem with time-dependent deteriorating jobsEuropean Journal of Operational Research2014234365065710.1016/j.ejor.2013.09.033
  • ChengTCEDingQLinBMTA concise survey of scheduling with time-dependent processing timesEuropean Journal of Operational Research2004152111310.1016/S0377-2217(02)00909-8
  • ChiangTCChengHCFuLCNNMA: An effective memetic algorithm for solving multiobjective permutation flow shop scheduling problemsExpert Systems with Applications20113855986599910.1016/j.eswa.2010.11.022
  • ChouFDLeeCETwo-machine flowshop scheduling with bicriteria problemComputers & Industrial Engineering199936354956410.1016/S0360-8352(99)00149-7
  • ChungYHTongLIBi-criteria minimization for the permutation flowshop scheduling problem with machine-based learning effectsComputers & Industrial Engineering201263130231210.1016/j.cie.2012.03.009
  • DangTTCombination of dispatching rules and prediction for solving multi-objective scheduling problemsInternational Journal of Production Research201351175180519410.1080/00207543.2013.793857
  • DugardinFYalaouiFAmodeoLNew multi-objective method to solve reentrant hybrid flow shop scheduling problemEuropean Journal of Operational Research20102031223110.1016/j.ejor.2009.06.031
  • ErenTGünerEA bicriteria flowshop scheduling with a learning effectApplied Mathematical Modelling20083291719173310.1016/j.apm.2007.06.009
  • GareyMRJohnsonDSSethiRThe complexity of flowshop and jobshop schedulingMathematics of Operations Research19761211712910.1287/moor.1.2.117
  • GawiejnowiczSTime-Dependent Scheduling2008
  • GawiejnowiczSKononovAComplexity and approximability of scheduling resumable proportionally deteriorating jobsEureapean Journal of Operational Research2010200130530810.1016/j.ejor.2008.12.014
  • GawiejnowiczSKurcWPankowskaLPareto and scalar bicriterion optimization in scheduling deteriorating jobsComputers & Operations Research200633374676710.1016/j.cor.2004.07.016
  • GawiejnowiczSLeeWCLinCLWuCCSingle-machine scheduling of proportionally deteriorating jobs by two agentsJournal of the Operational Research Society201162111983199110.1057/jors.2010.171
  • GuptaJNDGuptaSKSingle facility scheduling with nonlinear processing timesComputers & Industrial Engineering198814438739310.1016/0360-8352(88)90041-1
  • HuangXWangJBWangLYGaoWJWangXRSingle machine scheduling with time-dependent deterioration and exponential learning effectComputers & Industrial Engineering2010581586310.1016/j.cie.2009.08.003
  • Karimi-NasabaMFatemi GhomibSMTMulti-objective production scheduling with controllable processing times and sequence-dependent setups for deteriorating itemsInternational Journal of Production Research201250247378740010.1080/00207543.2011.649800
  • KononovAGawiejnowiczSNP-hard cases in scheduling deteriorating jobs on dedicated machinesJournal of the Operational Research Society200152670871710.1057/palgrave.jors.2601117
  • KuoWHYangDLA note on due-date assignment and single-machine scheduling with deteriorating jobs and learning effectsJournal of the Operational Research Society201162120621010.1057/jors.2009.155
  • LeeWCShiauYRChenSKWuCCA two-machine flowshop scheduling problem with deteriorating jobs and blockingInternational Journal of Production Economics2010124118819710.1016/j.ijpe.2009.11.001
  • LinBMTWuJMBicriteria scheduling in a two-machine permutation flowshopInternational Journal of Production Research200644122299231210.1080/00207540500446394
  • LiuMWangSChuCScheduling deteriorating jobs with past-sequence-dependent delivery timesInternational Journal of Production Economics2013144241842110.1016/j.ijpe.2013.03.009
  • LiuJWangYMinXSingle-machine scheduling with common due-window assignment for deteriorating jobsJournal of the Operational Research Society201465229130110.1057/jors.2013.6
  • LuDLogendranRBi-criteria group scheduling with sequence-dependent setup time in a flow shopJournal of the Operational Research Society201364453054610.1057/jors.2012.61
  • MosheiovGScheduling jobs under simple linear deteriorationComputers & Operations Research199421665365910.1016/0305-0548(94)90080-9
  • MosheiovGComplexity analysis of job-shop scheduling with deteriorating jobsDiscrete Applied Mathematics20021171–319520910.1016/S0166-218X(00)00385-1
  • NaderiaBAminnayeriMPiricMHa’iri YazdiMHMulti-objective no-wait flowshop scheduling problems: Models and algorithmsInternational Journal of Production Research201250102592260810.1080/00207543.2010.543937
  • NagarAHeraguSSHaddockJA branch-and-bound approach for a two-machine flowshop scheduling problemJournal of the Operational Research Society199546672173410.1057/jors.1995.102
  • NagarAHaddockJHeraguSMultiple and bicriteria scheduling: A literature surveyEuropean Journal of Operational Research19958118810410.1016/0377-2217(93)E0140-S
  • NagarAHeraguSSHaddockJA combined branch-and-bound and genetic algorithm based approach for a flowshop scheduling problemAnnals of Operations Research199663339741410.1007/BF02125405
  • OronDScheduling controllable processing time jobs in a deteriorating environmentJournal of the Operational Research Society2014651495610.1057/jors.2013.5
  • ShiauYRLeeWCWuCCChangCMTwo-machine flowshop scheduling to minimize mean flow time under simple linear deteriorationInternatioanl Journal of Advanced Manufacturing Technology2007347–877478210.1007/s00170-006-0646-8
  • SunYZhangCYGaoLWangXJMulti-objective optimization algorithms for flow shop scheduling problem: A review and prospectsInternational Journal of Advanced Manufacturing Technology2011555–872373910.1007/s00170-010-3094-4
  • WangJBNgCTDChengTCELiuL-LMinimizing total completion time in a two-machine flow shop with deteriorating jobsApplied Mathematics and Computation2006180118519310.1016/j.amc.2005.11.162
  • WuCCLeeWCTwo-machine flow shop scheduling to minimize mean flow time under linear deteriorationInternational Journal of Production Economics2006103257258410.1016/j.ijpe.2005.11.005
  • XuRChenHPLiXPA bi-objective scheduling problem on batch machines via a Pareto-based ant colony systemInternational Journal of Production Economics2013145137138610.1016/j.ijpe.2013.04.053
  • YangSHWangJBMinimizing total weighted completion time in a two-machine flow shop scheduling under simple linear deteriorationApplied Mathematics and Computation201121794819482610.1016/j.amc.2010.11.037
  • YehWCAn efficient branch-and-bound algorithm for the two-machine bicriteria flowshop scheduling problemJournal of Manufacturing Systems200120111312310.1016/S0278-6125(01)80034-0

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.