References
- BarahonaFBermonSGünlükOHoodSRobust capacity planning in semiconductor manufacturingNaval Research Logistics200552545946810.1002/nav.20086
- BermonSHoodSJCapacity optimization planning system (CAPS)Interfaces1999295315010.1287/inte.29.5.31
- BilginSAzizoǧluMCapacity and tool allocation problem in flexible manufacturing systemsJournal of the Operational Research Society200657667068110.1057/palgrave.jors.2602039
- ÇatayBErengüçSSVakhariaAJTool capacity planning in semiconductor manufacturingComputers & Operations Research20033091349136610.1016/S0305-0548(02)00075-8
- DegbotseADentonBTFordyceKMilneRJOrzellRWangC-TIBM blends heuristics and optimization to plan its semiconductor supply chainInterfaces201343213014110.1287/inte.1120.0642
- DentonBForrestJMilneRJIBM solves a mixed-integer program to optimize its semiconductor supply chainInterfaces200636538639910.1287/inte.1060.0238
- GaravelliACFlexibility configurations for the supply chain managementInternational Journal of Production Economics200385214115310.1016/S0925-5273(03)00106-3
- GengNJiangZA review on strategic capacity planning for the semiconductor manufacturing industryInternational Journal of Production Research200947133639365510.1080/00207540701871051
- GoetschalckxMVidalCJDoganKModeling and design of global logistics systems: A review of integrated strategic and tactical models and design algorithmsEuropean Journal of Operational Research2002143111810.1016/S0377-2217(02)00142-X
- HoodSJBermonSBarahonaFCapacity planning under demand uncertainty for semiconductor manufacturingIEEE Transactions on Semiconductor Manufacturing200316227328010.1109/TSM.2003.811894
- LeachmanRCBensonRFLiuCRaarDJIMPReSS: An automated production-planning and delivery-quotation system at Harris corporation—semiconductor sectorInterfaces199626163710.1287/inte.26.1.6
- LeeYKimSYeaSKimBProduction planning in semiconductor wafer fab considering variable cycle timesComputers & Industrial Engineering1997333–471371610.1016/S0360-8352(97)00229-5
- McKinsey & Company (2012). Lighting the Way: Perspectives on the Global Lighting Market. McKinsey & Company: Munich, Germany.
- MilneRJWangC-TEnhancing mathematical programming models to account for demand priorities increasing as a function of delivery dateJournal of Industrial and Production Engineering2014311516310.1080/21681015.2014.881426
- MilneRJWangC-TYenC-KAFordyceKOptimized material requirements planning for semiconductor manufacturingJournal of the Operational Research Society201263111566157710.1057/jors.2012.1
- Orr G and Thomas C (2014). Semiconductors in China: Brave new world or same old story?http://www.mckinsey.com/insights/high_tech_telecoms_internet/semiconductors_in_china_brave_new_world_or_same_old_story, accessed 17 December 2014.
- RastogiAPFowlerJWCarlyleWMArazOMMaltzABükeBSupply network capacity planning for semiconductor manufacturing with uncertain demand and correlation in demand considerationsInternational Journal of Production Economics2011134232233210.1016/j.ijpe.2009.11.006
- SEMI Taiwan (2013). The Power of [Taiwan]. SEMI Taiwan: Taipei, Taiwan.
- StrayJFowlerJWCarlyleWMRastogiAPEnterprise-wide semiconductor manufacturing resource planningIEEE Transactions on Semiconductor Manufacturing200619225926810.1109/TSM.2006.873399
- SwaminathanJMTool capacity planning for semiconductor fabrication facilities under demand uncertaintyEuropean Journal of Operational Research2000120354555810.1016/S0377-2217(98)00389-0
- US Department of Energy (2012). Life-Cycle Assessment of Energy and Environmental Impacts of LED Lighting Products part 2: LED Manufacturing and Performance. US Department of Energy: Washington DC, USA.
- WadhwaSSaxenaAChanFTSFramework for flexibility in dynamic supply chain managementInternational Journal of Production Economics20084661373140410.1080/00207540600570432
- WangK-JLinS-HCapacity expansion and allocation for a semiconductor testing facility under constrained budgetProduction Planning and Control200213542943710.1080/09537280110121082
- ZhangMTNiuSDengSZhangZLiQZhengLHierarchical capacity planning with reconfigurable kits in global semiconductor assembly and test manufacturingIEEE Transactions on Automation Science and Engineering20074454355210.1109/TASE.2007.905977