References
- AktürkMSAtamtürkAGürelSParallel machine match-up scheduling with manufacturing cost considerationsJournal of Scheduling20101319511010.1007/s10951-009-0111-2
- AlidaeeBAhmadianATwo parallel machine sequencing problems involving controllable job processing timesEuropean Journal of Operational Research199370333534110.1016/0377-2217(93)90245-I
- CaoDChenMWanGParallel machine selection and job scheduling to minimize machine cost and job tardinessComputers & Operations Research20053281995201210.1016/j.cor.2004.01.001
- DebKPratapAAgarwalSMeyarivanTA fast and elitist multiobjective genetic algorithm: NSGA-IIIEEE Transactions on Evolutionary Computation20026218219710.1109/4235.996017
- FangK-TLinBMTParallel-machine scheduling to minimize tardiness penalty and power costComputers & Industrial Engineering201364122423410.1016/j.cie.2012.10.002
- GharehgozliAHTavakkoli-MoghaddamRZaerpourNA fuzzy-mixed-integer goal programming model for a parallel-machine scheduling problem with sequence-dependent setup times and release datesRobotics and Computer-Integrated Manufacturing2009254–585385910.1016/j.rcim.2008.12.005
- GrahamRLLawlerELLenstraJKRinnooy KanAHGOptimization and approximation in deterministic sequencing and scheduling: A surveyAnnals of Discrete Mathematics1979528732610.1016/S0167-5060(08)70356-X
- GurelSAkturkMSScheduling parallel CNC machines with time/cost trade-off considerationsComputers & Operations Research20073492774278910.1016/j.cor.2005.10.018
- GürelSKörpeoğluEAktürkMSAn anticipative scheduling approach with controllable processing timesComputers & Operations Research20103761002101310.1016/j.cor.2009.09.001
- HuangBFeryPXueLWangYSeeking the Pareto front for multiobjective spatial optimization problemsInternational Journal of Geographical Information Science200822550752610.1080/13658810701492365
- JansenKMastrolilliMApproximation schemes for parallel machine scheduling problems with controllable processing timesComputers & Operations Research200431101565158110.1016/S0305-0548(03)00101-1
- KayvanfarVKomakiGHMAalaeiAZandiehMMinimizing total tardiness and earliness on unrelated parallel machines with controllable processing timesComputers & Operations Research201441314310.1016/j.cor.2013.08.003
- KimIYde WeckOLAdaptive weighted-sum method for bi-objective optimization: Pareto front generationStructural and Multidisciplinary Optimization200529214915810.1007/s00158-004-0465-1
- LawlerELA pseudopolynomial algorithm for sequencing jobs to minimize total tardinessAnnals of Discrete Mathematics1977133134210.1016/S0167-5060(08)70742-8
- LeyvandYShabtayDSteinerGYedidsionLJust-in-time scheduling with controllable processing times on parallel machinesJournal of Combinatorial Optimization201019334736810.1007/s10878-009-9270-5
- LiKShiYYangS-LChengB-YParallel machine scheduling problem to minimize the makespan with resource dependent processing timesApplied Soft Computing20111185551555710.1016/j.asoc.2011.05.005
- MazdehMMZaerpourFZareeiAHajinezhadAParallel machines scheduling to minimize job tardiness and machine deteriorating cost with deteriorating jobsApplied Mathematical Modelling20103461498151010.1016/j.apm.2009.08.023
- NowickiEZdrzałkaSA bicriterion approach to preemptive scheduling of parallel machines with controllable job processing timesDiscrete Applied Mathematics199563323725610.1016/0166-218X(94)00071-5
- PfundMFowlerJWGadkariAChenYScheduling jobs on parallel machines with setup times and ready timesComputers & Industrial Engineering200854476478210.1016/j.cie.2007.08.011
- SamanliogluFA multi-objective mathematical model for the industrial hazardous waste location-routing problemEuropean Journal of Operational Research2013226233234010.1016/j.ejor.2012.11.019
- ShabtayDSteinerGA survey of scheduling with controllable processing timesDiscrete Applied Mathematics2007155131643166610.1016/j.dam.2007.02.003
- SteuerREMultiple Criteria Optimization: Theory, Computation, and Application1986
- SteuerREChooE-UAn interactive weighted Tchebycheff procedure for multiple objective programmingMathematical Programming198326332634410.1007/BF02591870
- TindJWiecekMMAugmented Lagrangian and Tchebycheff approaches in multiple objective programmingJournal of Global Optimization199914325126610.1023/A:1008314306344
- TsengC-TLiaoC-JHuangK-LMinimizing total tardiness on a single machine with controllable processing timesComputers & Operations Research20093661852185810.1016/j.cor.2008.05.009
- Van WassenhoveLNBakerKRA bicriterion approach to time/cost trade-offs in sequencingEuropean Journal of Operational Research1982111485210.1016/S0377-2217(82)80008-8
- VicksonRGTwo single machine sequencing problems involving contollable job processing timesIIE Transactions1980123258262