References
- AhilanCKumananSSivakumaranNDhasJERModeling and prediction of machining quality in CNC turning process using intelligent hybrid decision making toolsApplied Soft Computing20131331543155110.1016/j.asoc.2012.03.071
- AllahverdiANgCChengTKovalyovMYA survey of scheduling problems with setup times or costsEuropean Journal of Operational Research20081873985103210.1016/j.ejor.2006.06.060
- BelaidRTkindtVEssweinCScheduling batches in flowshop with limited buffers in the shampoo industryEuropean Journal of Operational Research2012223256057210.1016/j.ejor.2012.06.035
- Brooks R (2012). High-performance cutting of hard aero-alloys, http://americanmachinist.com/machining-cutting/high-performance-cutting-hard-aero-alloys, accessed 20 November 2014.
- CoelloCACVan VeldhuizenDALamontGBEvolutionary Algorithms for Solving Multi-Objective Problems2002
- ColletteYSiarryPMultiobjective Optimization: Principles and Case Studies2004
- CostaLEspirito SantoIAFernandesEMA hybrid genetic pattern search augmented Lagrangian method for constrained global optimizationApplied Mathematics and Computation2012218189415942610.1016/j.amc.2012.03.025
- DebKSinhaASolving bilevel multi-objective optimization problems using evolutionary algorithmsEvolutionary Multi-Criterion Optimization2009110124
- DiazNRedelsheimerEDornfeldDEnergy consumption characterization and reduction strategies for milling machine tool useGlocalized Solutions for Sustainability in Manufacturing2011263267
- DuflouJRTowards energy and resource efficient manufacturing: A processes and systems approachCIRP Annals-Manufacturing Technology201261258760910.1016/j.cirp.2012.05.002
- EPA (2013). Greenhouse gas equivalencies calculator, http://www.epa.gov/cleanenergy/energy-resources/calculator.html, accessed 8 November 2013.
- FangKUhanNZhaoFSutherlandJWA new approach to scheduling in manufacturing for power consumption and carbon footprint reductionJournal of Manufacturing Systems201130423424010.1016/j.jmsy.2011.08.004
- FangK-TLinBMParallel-machine scheduling to minimize tardiness penalty and power costComputers & Industrial Engineering201364122423410.1016/j.cie.2012.10.002
- GharbiALadhariTMsakniMKSerairiMThe two-machine flowshop scheduling problem with sequence-independent setup times: New lower bounding strategiesEuropean Journal of Operational Research20132311697810.1016/j.ejor.2013.05.031
- GoldbergDEGenetic Algorithms2006
- GongXZhouSXOptimal production planning with emissions tradingOperations Research201361490892410.1287/opre.2013.1189
- GrahamRLLawlerELLenstraJKKanAOptimization and approximation in deterministic sequencing and scheduling: A surveyAnnals of Discrete Mathematics1979528732610.1016/S0167-5060(08)70356-X
- GuptaJNDarrowWPThe two-machine sequence dependent flowshop scheduling problemEuropean Journal of Operational Research198624343944610.1016/0377-2217(86)90037-8
- HeYLiuFCaoH-jLiC-bA bi-objective model for job-shop scheduling problem to minimize both energy consumption and makespanJournal of Central South University of Technology200512216717110.1007/s11771-005-0033-x
- Heidenhain (2011). Aspects of energy efficiency in machine tools, http://www.heidenhain.us/enews/stories_1011/MTmain.php, accessed 20 November 2014.
- HyunCJKimYKimYKA genetic algorithm for multiple objective sequencing problems in mixed model assembly linesComputers & Operations Research199825767569010.1016/S0305-0548(98)00026-4
- IbrahimovMMohaisASchellenbergSMichalewiczZScheduling in iron ore open-pit miningThe International Journal of Advanced Manufacturing Technology2014725–81021103710.1007/s00170-014-5619-8
- JogPSuhJYVan GuchtDParallel genetic algorithms applied to the traveling salesman problemSIAM Journal on Optimization19911451552910.1137/0801031
- LiuG-SZhangB-XYangH-DChenXHuangGQA branch-and-bound algorithm for minimizing the energy consumption in the PFS problemMathematical Problems in Engineering2013201316
- LuDLogendranRBi-criteria group scheduling with sequence-dependent setup time in a flow shopJournal of the Operational Research Society201264453054610.1057/jors.2012.61
- LuoHDuBHuangGQChenHLiXHybrid flow shop scheduling considering machine electricity consumption costInternational Journal of Production Economics2013146242343910.1016/j.ijpe.2013.01.028
- MansouriSAAktasEBesikciUGreen scheduling of a two-machine flowshop: Trade-off between makespan and energy consumptionEuropean Journal of Operational Research2016248377278810.1016/j.ejor.2015.08.064
- MichalewiczZGenetic Algorithms+Data Structures=Evolution Programs1996
- MouzonGYildirimMBA framework to minimise total energy consumption and total tardiness on a single machineInternational Journal of Sustainable Engineering20081210511610.1080/19397030802257236
- MouzonGYildirimMBTwomeyJOperational methods for minimization of energy consumption of manufacturing equipmentInternational Journal of Production Research20074518–194247427110.1080/00207540701450013
- NaderiBZandiehMRoshanaeiVScheduling hybrid flowshops with sequence dependent setup times to minimize makespan and maximum tardinessThe International Journal of Advanced Manufacturing Technology20094111–121186119810.1007/s00170-008-1569-3
- NawazMEnscoreEEJrHamIA heuristic algorithm for the m-machine, n-job flow-shop sequencing problemOmega1983111919510.1016/0305-0483(83)90088-9
- OECD-IEA (2007). Tracking industrial energy efficiency and CO2 emissions. Technical Report International Energy Agency.
- RahimifardSSeowYChildsTMinimising embodied product energy to support energy efficient manufacturingCIRP Annals—Manufacturing Technology2010591252810.1016/j.cirp.2010.03.048
- RuizRMarotoCAlcarazJSolving the flowshop scheduling problem with sequence dependent setup times using advanced metaheuristicsEuropean Journal of Operational Research20051651345410.1016/j.ejor.2004.01.022
- RuizRStützleTAn iterated greedy heuristic for the sequence dependent setup times flowshop problem with makespan and weighted tardiness objectivesEuropean Journal of Operational Research200818731143115910.1016/j.ejor.2006.07.029
- SabouniMYLogendranRCarryover sequence-dependent group scheduling with the integration of internal and external setup timesEuropean Journal of Operational Research2013224182210.1016/j.ejor.2012.07.013
- SrinivasNDebKMuiltiobjective optimization using nondominated sorting in genetic algorithmsEvolutionary Computation19942322124810.1162/evco.1994.2.3.221
- TaillardESome efficient heuristic methods for the flow shop sequencing problemEuropean Journal of Operational Research1990471657410.1016/0377-2217(90)90090-X
- TiwariAChangP-CTiwariMKollanoorNJA Pareto block-based estimation and distribution algorithm for multi-objective permutation flow shop scheduling problemInternational Journal of Production Research201553379383410.1080/00207543.2014.933273
- T'kindtVBillautJ-CMulticriteria Scheduling. Theory, Models and Algorithms2006
- UrukZGultekinHAkturkMSTwo-machine flowshop scheduling with flexible operations and controllable processing timesComputers & Operations Research201340263965310.1016/j.cor.2012.09.001
- YeniseyMMYagmahanBMulti-objective permutation flow shop scheduling problem: Literature review, classification and current trendsOmega20144511913510.1016/j.omega.2013.07.004
- YoshidaTHitomiKOptimal two-stage production scheduling with setup times separatedAIIE Transactions197911326126310.1080/05695557908974469