References
- AshRCPittmanPHTowards holistic project scheduling using critical chain methodology enhanced with PERT bufferingInternational Journal of Project Organisation and Management200812 185 20310.1504/IJPOM.2008.022191
- Ashtiani B, Jalali GR, Aryanezhad MB and Makui A (2007). A new approach for buffer sizing in critical chain scheduling. In Helander M, Xie M, Jiao R and Tan KC (eds). International Conference on Industrial Engineering and Engineering Management, 2007 IEEE International Conference, IEEE, Singapore, pp 1037–1041.
- BaradMEngelAOptimizing VVT strategies: A decomposition approachJournal of the Operational Research Society200657896597410.1057/palgrave.jors.2602077
- BevilacquaMCiarapicaFEGiacchettaGCritical chain and risk analysis applied to high-risk industry maintenance: A case studyInternational Journal of Project Management200927441943210.1016/j.ijproman.2008.06.006
- ChoSHEppingerSDA simulation-based process model for managing complex design projectsIEEE Transactions on Engineering Management200552331632810.1109/TEM.2005.850722
- EppingerSDBrowningTRDesign Structure Matrix Methods and Applications2012
- FallahMAshtianiBAryanezhadMBCritical chain project scheduling: Utilizing uncertainty for buffer sizingInternational Journal of Research and Reviews in Apllied Siecnces201033280289
- GoldrattEMCritical Chain: A Business Novel1997
- GonzálezVAlarcónLFYiuTWIntegrated methodology to design and manage work-in-process buffers in repetitive building projectsJournal of the Operational Research Society20136481182119310.1057/jors.2012.163
- HerroelenWLeusROn the merits and pitfalls of critical chain schedulingJournal of Operations Management200119555957710.1016/S0272-6963(01)00054-7
- KastorASirakoulisKThe effectiveness of resource levelling tools for resource constraint project scheduling problemInternational Journal of Project Management200927549350010.1016/j.ijproman.2008.08.006
- KhemakhemMAChtourouHEfficient robustness measures for the resource-constrained project scheduling problemInternational Journal of Industrial and Systems Engineering201314224526710.1504/IJISE.2013.053738
- KhoueiryYSrourIYassineAAn optimization-based model for maximizing the benefits of fast-track construction activitiesJournal of the Operational Research Society20136481137114610.1057/jors.2013.30
- KoukopoulosASaniGDSM‐5 criteria for depression with mixed features: A farewell to mixed depressionActa psychiatrica Scandinavica2014129141610.1111/acps.12140
- LeachLPCritical Chain Project Management2014
- LongLDOhsatoAFuzzy critical chain method for project scheduling under resource constraints and uncertaintyInternational Journal of Project Management200826668869810.1016/j.ijproman.2007.09.012
- NeftiSOussalahMRezguiYA modified fuzzy clustering for documents retrieval: Application to document categorizationJournal of the Operational Research Society200960338439410.1057/palgrave.jors.2602555
- NewboldRCProject Management in the Fast Lane: Applying the Theory of Constraints1998
- OsmanIHAhmadiSGuided construction search metaheuristics for the capacitated p-median problem with single source constraintJournal of the Operational Research Society200758110011410.1057/palgrave.jors.2602135
- PengWHuangMA critical chain project scheduling method based on a differential evolution algorithmInternational Journal of Production Research201452133940394910.1080/00207543.2013.865091
- RabbaniMGhomiSFJolaiFLahijiNSA new heuristic for resource-constrained project scheduling in stochastic networks using critical chain conceptEuropean Journal of Operational Research2007176279480810.1016/j.ejor.2005.09.018
- RazTBarnesRDvirDA critical look at critical chain project managementProject Management Journal20043442432
- ShiQWangYTGongTAn improved approach for project buffer sizing and evaluationSystems Engineering—Theory & Practice201232817391746
- StrattonRCritical chain project management theory and practiceJournal of Project Management and Systems Engineering2009214149173
- Shou Y and Yao KT (2000). Estimation of project buffers in critical chain project management. In: Bauly JA and Fong ACM (eds). Proceedings of the 2000 IEEE International Conference on Management of Innovation and Technology, ICMIT 2000, Vol. 1. IEEE, Institution of Engineers, Singapore, pp 162–167.
- SteynHProject management application of the theory of constraints beyond critical chain schedulingInternational Journal of Project Management2002201758010.1016/S0263-7863(00)00054-5
- StewardDVThe design structure system: A method for managing the design of complex systemsEngineering Management, IEEE Transactions on1981283717410.1109/TEM.1981.6448589
- TrietschDMazmanyanLGevorgyanLBakerKRModeling activity times by the Parkinson distribution with a lognormal core: Theory and validationEuropean Journal of Operational Research2012216238639610.1016/j.ejor.2011.07.054
- TukelOIRomWOEksiogluSDAn investigation of buffer sizing techniques in critical chain schedulingEuropean Journal of Operational Research2006172240141610.1016/j.ejor.2004.10.019
- YanHSWangBXuDWangZComputing completion time and optimal scheduling of design activities in concurrent product development processSystems, Man and Cybernetics, Part A: Systems and Humans, IEEE Transactions on2010401768910.1109/TSMCA.2009.2030417
- YangQHuangJMProject time calculation and optimization based on DSM activities overlappingSystems Engineering—-Theory & Practice2011313496504
- YangXGaoPA quantitative research on the time buffer of critical chain project managementShanghai Management Science20123436266
- YangQLuTYaoTZhangBThe impact of uncertainty and ambiguity related to iteration and overlapping on schedule of product development projectsInternational Journal of Project Management201432582783710.1016/j.ijproman.2013.10.010
- YangQTangELCross-domain integration and optimization of the process and product architecture in product development projectsSystems Engineering - Theory & Practice201434615251532
- YangQYaoTLuTZhangBAn overlapping-based design structure matrix for measuring interaction strength and clustering analysis in product development projectIEEE Transactions on Engineering Management201461115917010.1109/TEM.2013.2267779
- Yang L, Fu Y, Li S, Huang B and Tao P (2008, October). A buffer sizing approach in critical chain scheduling with attributes dependent. In: Graffox D and Romeo D (eds). 4th International Conference on Wireless Communications, Networking and Mobile Computing, WiCOM’08. IEEE, Dalian, China, pp 1–4.
- YassineAAChidiacRHOsmanIHSimultaneous optimization of products, processes, and people in development projectsJournal of Engineering Design201324427229210.1080/09544828.2012.727206
- ZhangJShiRDiazEDynamic monitoring and control of software project effort based on an effort bufferJournal of the Operational Research Society20156691555156510.1057/jors.2014.125
- ZhangJSongXChenHShiROptimization of critical chain sequencing based on activities’ information flow interactionsInternational Journal of Production Research201553206231624110.1080/00207543.2015.1043157